Laserfiche WebLink
Certified Drawing for 7.5T <br />Project: Climatec Energy - City of San Leandro 01/15/2016 <br />Prepared By: 02:54PM <br />Packaged Rooft <br />Service Clearance <br />B <br />/r q <br />LOCATION <br />DIMENSION <br />CONDITION <br />4&In (1219 mm] <br />•Noir d --is mounted an panel <br />3—(914 mm) <br />•IldlmensbrrB 1512-1n (305. <br />3O5 mm <br />A <br />16 -in (45J mm( <br />•Nodistannect, mnreniems outlet option <br />• RecommerMed service dearanre (are electncsnewdrrver( <br />12 in (3O5 mm( <br />•Minimum clearance (use nual ratchetscrewdrrveri <br />3— (919 mm( <br />• Nnit has ecocgm2er <br />!! <br />12 -In (305 mm( <br />• If d --is 3b1n (914 mm) <br />Spetlel <br />k, <br />•Check far sources of Rue products wRhm -ft of ,It flesh aR Trteke hood <br />-F, (914 mm( <br />•Sde mndensate drainF used <br />1&in (45J mm( <br />•Minimum Clea ranre <br />4&in (1219 mm) <br />•No Rae d¢charge accessorylnstalted,surface fs cornbustlble material <br />42in 11067 m) <br />grountl(e.g., metal, masonrywall,anMhern T) <br />•Surta[e beh[ntl serNcer6 de <br />D <br />3—(914 mm] <br />•Surfecace behind serviceru elechicaliy nonconductive e.g., wood, fiberglass) <br />•Chis far adpcentunits ar buflding fresh <br />Special <br />NOTE: Unit not designed to have werhead abstract —. ContactAppl kation Engineering far gu,d—y <br />on an <br />werhead obstruction or vertical <br />appb®tmh planning clearances. <br />Packaged Rooft <br />air intakes wRhin lUR otthis units <br />re�e ower <br />op Builder 1.33w Page 29 of 48 <br />