My WebLink
|
Help
|
About
|
Sign Out
Home
4A Public Hearing 2016 0516
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0516
>
4A Public Hearing 2016 0516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 9:04:41 AM
Creation date
5/11/2016 5:29:31 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/16/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0516 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0516
Reso 2016-054
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
History Museum <br />Lighting <br />Retrofit existing indoor and outdoor incandescent light fixtures to new, high -efficiency LED fixtures <br />which will provide long life and instant start capability. Refer to the lighting inventory for specific <br />locations and applications. <br />Main Library <br />Lighting <br />Retrofit existing indoor and outdoor HID fixtures to new, high -efficiency LED fixtures which will <br />provide long life and instant start capability. Refer to the lighting inventory for specific locations and <br />applications. <br />HVAC <br />sA Replace existing 110 ton chiller with anew chiller of equivalent size. Remove the existing York 110 -ton <br />chiller, dispose of as required. Provide —install one new high efficiency Daikin 110 -ton scroll chiller (5 — <br />year compressor warranty). This is to include modifying- reconnecting the existing electric power wiring, <br />chilled water supply — return pip ng, condenser water supply — return piping, affected piping insulation <br />and low voltage control wiring. Included is start—up of the new chiller including filling out all documents <br />necessary on the start-up paperwork. <br />Controls <br />Integrate three (3) existing lighting panels into the Johnson Controls Building Automation System (BAS). <br />Add or update screens on the City s existing master control station to allow for remote control and <br />monitoring of the integrated lighting panels. <br />Manor Branch Library <br />Lighting <br />Retrofit existing outdoor huilding-mounted HID fixtures to new, high -efficiency LED fixtures which <br />will provide long life and instant start capability. Refer to the lighting inventory for specific locations <br />and applications. <br />Controls <br />,JC Replace one (1) obsolete lighting control panel and integrate it into the existing Johnson Controls <br />Building Automation System (BAS). Add or update screens on the City's existing master control station <br />to allow for remote control and monitoring of the integrated lightingpanels. New lighting control panel <br />will provide remote control and scheduling capabilities. <br />South Branch Library <br />Lighting <br />Retrofit existing outdoor HID fixture to new, high -efficiency LED fixtures wh ch will provide long life <br />and instant start capability. Refer to the lighting inventory for specific locations and applications. <br />p City of San Leandro <br />a_ CLIMATEC Installation Agreement — Att A <br />' - Page 4 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.