Laserfiche WebLink
Performance Summary For 75T <br />Project: Climatec Energy - Mitch California Project 10/22/2015 <br />Prepared By: 10:52AM <br />Re mFanCurve <br />7ORPM <br />9OORFM <br />1 <br />9ORPMA <br />DOORPM <br />1OOR <br />1 <br />1 �IORRv1 <br />1400 <br />irOO <br />1 <br />3 RPM <br />1 <br />O]PvP <br />OOBHP <br />9� <br />3].00 <br />MP <br />P <br />00 <br />P <br />1 <br />0 <br />4 <br />8 12 <br />16 <br />2] <br />21 <br />23 <br />22 <br />38 <br />4 <br />Af flow(CFM-thousands) <br />RPM— 1188 BHP=26.74 MaximumRPM=1440 MaximumHP=60.00 <br />S C - System Curve RP-RatedPoint <br />Applied Rooftop Builder 3.19k Page 10 of 15 <br />