My WebLink
|
Help
|
About
|
Sign Out
Home
4A Public Hearing 2016 0516
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0516
>
4A Public Hearing 2016 0516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 9:04:41 AM
Creation date
5/11/2016 5:29:31 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/16/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0516 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0516
Reso 2016-054
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
A specific Measurement and Verification Plan is submitted for each Facility Conservation Measure (FEM) to provide <br />a comprehensive overall Plan for City of San Leandro. Energy savings are to be compared to the Utility Baseline <br />Summary, as shown in Attachment B to this agreement. Each measure's M&V Plan provides: <br />A description of how the savings shall be verified for each FEM. <br />➢ Selection of specific protocol for verification of savings of each FEM. <br />➢ Requirements for measurement or other means to establish the FEM savings. <br />Climatec Building Technologies Group (Climatec LLC) is responsible for the pre -retrofit measurement, energy savings <br />calculations, equipment installation, and required post retrofit verification as outlined herein. Purchaser agrees to <br />operate and maintain all equipment installed. Proper operation and maintenance of equipment and systems is <br />critical to long-term achievement of energy savings. <br />SAVINGS GUARANTEE <br />Climatec LLC warrants that Purchaser shall realize total energy and water savings, total operational savings and utility <br />rebates ("Guaranteed Project Savings") in excess of the project cost as shown in the Installation Agreement during the <br />course of the useful life of the installed equipment. The effective date will begin on the date of final acceptance of the <br />Installation project and receipt of final payment for the associated Installation Contract and continue for a term not to <br />exceed 15 years (Guarantee Period). Climatec LLC agrees to complete the M&V Report on an annual basis and <br />deliver to the Purchaser within sixty (60) days of the anniversary date of final acceptance and annually thereafter. <br />Project savings that are verified during the course of construction will be applied to the 1st year guaranteed project <br />savings. <br />If the annual M&V Report demonstrates that the project will achieve one hundred percent (100%) or more of the <br />Guaranteed Project Annual Savings, then Climatec LLC shall have satisfied its energy performance guarantee <br />obligation and the Purchaser shall accept the Annual M&V Report. <br />In the event that an annual M&V Report savings value (including any excess savings from previous years) does not <br />meet the Guaranteed Project Savings in accordance with the M&V Plan, then Climatec LLC shall repair, replace, or <br />substitute the ECM that is not performing at the required level, as identified in the M&V Report. Following <br />corrective action, Climatec LLC shall re -perform the relevant M&V work for the affected ECM(s) and amend or <br />supplement the M&V Report. If the sum of the ECMs indicates that the Guaranteed Project Savings are met or <br />exceeded, then no further remedy shall be required. <br />If, after the opportunity to make corrections, the M&V Report, as amended, indicates that verified savings are less <br />than the Guaranteed Project Savings as shown in the Savings Summary, then Climatec LLC shall pay the Purchaser <br />the shortfall amount. However, under no circumstances will the amount(s) paid for the total of the energy savings <br />shortfalls exceed the Installation Contract Amount. <br />The Purchaser agrees that project savings, which exceed the guaranteed amount in any one (1) year, may be applied to <br />previous or future year's savings to offset an energy savings shortfall. The savings guarantee will remain in effect for <br />the term of this agreement. Cancellation of this agreement will result in the termination of the savings guarantee. <br />The Utility Baseline Summary, as shown in Attachment B, may be modified over the course of the Guarantee Period <br />to adjust for changes in utility rates, number of days in utility billing cycle, square footage, energy using equipment, <br />building occupancy and weather. This Guarantee is subject to the Purchaser's adherence to the Standards of <br />Operation for Lighting and HVAC systems, as documented in Attachment "C" of this agreement. <br />Attachment A <br />*CLIMATEC' Page 3 of 13 <br />MFRGING BUIL-DINGO & TFC.HNQL_LK!v <br />
The URL can be used to link to this page
Your browser does not support the video tag.