Laserfiche WebLink
SELECTED MEASUREMENT AND VERIFICATION OPTIONS <br />For the FEM's covered under this M&V plan, the Table of Selected M&V Options, located on the following page <br />summarizes the proposed IPMVP Options selected: See table 1.1 below <br />TABLE 1.1 <br />Site <br />Lighting System <br />Upgrades <br />System New HVAC <br />y <br />Installation <br />HVAC Control <br />Upgrades <br />City Hall <br />A <br />A <br />A <br />Downtown Parking Garage <br />A <br />Fire Stations # 9, 10, 11, 12 & 13 <br />A <br />Halcyon Park Kiddie College/Park <br />A <br />History Museum <br />A <br />Main Library <br />A <br />A <br />Manor Branch Library <br />A <br />Marina Community Center <br />A <br />A <br />Public Safety (Police)/PD Motor Barn <br />A <br />Public Works <br />A <br />San Leandro Family Aquatic Center <br />A <br />A <br />South Branch Library <br />A <br />A <br />Washington Manor Kiddie College/Park <br />A <br />Water Pollution Control and New <br />Administration Building <br />A <br />Bonarie Park <br />A <br />Grover Cleveland Park <br />A <br />Heath Park <br />Marina Park/Marina <br />A <br />McCartney Park <br />A <br />Memorial Park <br />A <br />Root Park <br />A <br />San Leandro Ball Park (aka Burrell Field) <br />A <br />Stenzel Park <br />A <br />Thrasher Park <br />A <br />Toyon Park <br />A <br />Victoria Park <br />A <br />Warden Park <br />A <br />Attachment A <br />*CUMATEC Page 6 of 13 <br />MERGING BUILDINGS & TECXiiNOL.OGY <br />