<br />PROJECT TITLE: Curb Ramp Upgrades 2015-16
<br />PROJECT NO.: 2016.0071
<br />BID NO.: 15-16.014
<br />BID SUMMARY
<br />'his document is a summary of bids received for the subject project and are provided
<br />my as a convenience. Listing of a particular bid is not a finding that such bid has been
<br />)und to be responsive or accepted as complete by the City. An award of contract, if
<br />ny, is subject to approval of the City Council and/or the City Manager. Contractors
<br />hould refer to the contract documents for bidding information.
<br />BID OPENING
<br />DATE: Thursday, April 21, 2016
<br />TIME: 3:00 p.m.
<br />LOCATION: City Clerk's Office
<br />ENGINEER'S ESTIMATE
<br />Date Approved: 3/24/2016
<br />Prepared by:
<br />Rosas Brothers Construction
<br />4731 Coliseum Way
<br />Oakland, CA 94601
<br />Phone: (510) 534-1077
<br />Fax: (510) 534-5077
<br />JJR Construction, Inc.
<br />1120 Ninth Avenue
<br />San Mateo, CA 94402
<br />Phone: (650) 343-6109
<br />Fax: (650) 343-6207
<br />ITEM
<br />NO:
<br />ITEM QUANTITY
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />1
<br />Mobilization
<br />1 LS
<br />$50,000.00
<br />$50,000.00
<br />$8,000.00
<br />$8,000.00
<br />$30,000.00
<br />$30,000.00
<br />2
<br />Traffic Control per section 7-10.3.
<br />1 LS
<br />$40,000.00
<br />$40,000.00
<br />$8,000.00
<br />$8,000.00
<br />$55,000.00
<br />$55,000.00
<br />3
<br />Install Curb and Gutter per drawing
<br />3,500 LF
<br />$60.00
<br />$210,000.00
<br />$78.00
<br />$273,000.00
<br />$138.00
<br />$483,000.00
<br />100 case 3101
<br />4
<br />Install Sidewalk per drawing 100
<br />3,100 SF
<br />$15.00
<br />$46,500.00
<br />$14.00
<br />$43,400.00
<br />$17.00
<br />$52,700.00
<br />case 3101
<br />5
<br />Install Wheelchair Curb Cut Ramp
<br />24,000 SF
<br />$18.00
<br />$432,000.00
<br />$19.50
<br />$468,000.00
<br />$21.00
<br />$504,000.00
<br />per drawing 106A and 106B case
<br />3101
<br />6
<br />Install Concrete Apron per drawing
<br />750 SF
<br />$26.00
<br />$19,500.00
<br />$20.00
<br />$15,000.00
<br />$40.00
<br />$30,000.00
<br />114 case 3101
<br />7
<br />Install Surface Mounted Truncated
<br />120 SF
<br />$50.00
<br />$6,000.00
<br />$55.00
<br />$6,600.00
<br />$50.00
<br />$6,000.00
<br />Domes on (e) concrete surface per
<br />drawing 106D case 3101
<br />8
<br />Install Decomposed Granite
<br />2 TN
<br />$1,500.00
<br />$3,000.00
<br />$600.00
<br />$1,200.00
<br />$1,500.00
<br />$3,000.00
<br />Hardscape per 308-9
<br />9
<br />Adjust Utility Valve Cover to grade
<br />6 EA
<br />$200.00
<br />$1,200.00
<br />$250.00
<br />$1,500.00
<br />$392.00
<br />$2,352.00
<br />or Utility Box to grade per 301.6
<br />10
<br />Relocate Utility Box per 307-2.4
<br />12 EA
<br />$300.00
<br />$3,600.00
<br />$1,000.00
<br />$12,000.00
<br />$1,650.00
<br />$19,800.00
<br />11
<br />Relocate Pedestrian Push Button
<br />2 EA
<br />$1,200.00
<br />$2,400.00
<br />$2,600.00
<br />$5,200.00
<br />$2,875.00
<br />$5,750.00
<br />Post per 307-2.3
<br />12
<br />Install New Pedestrian Push Button
<br />6 EA
<br />$1,500.00
<br />$9,000.00
<br />$2,500.00
<br />$15,000.00
<br />$5,750.00
<br />$34,500.00
<br />Post Per 307-2.3
<br />13
<br />Relocate Traffic Signal 1 B Pole per
<br />1 EA
<br />$3,000.00
<br />$3,000.00
<br />$6,000.00
<br />$6,000.00
<br />$11,500.00
<br />$11,500.00
<br />307-2.3
<br />14
<br />Install 2 -inch Conduit per 307-2.5
<br />300 EA
<br />$5.00
<br />$1,500.00
<br />$80.00
<br />$24,000.00
<br />$35.00
<br />$10,500.00
<br />Curb Ramp Upgrades 2015-16 Page 1 of 2 Printed 4/27/2016 @ 2:14 PM