F 5AN tFq <br />rv.Ax�oeraAaroiw <br />RPO RATE <br />PROJECT TITLE: Curb Ramp Upgrades 2015-16 <br />PROJECT NO.: 2016.0071 <br />BID NO.: 15-16.014 <br />BID SUMMARY <br />'his document is a summary of bids received for the subject project and are provided <br />my as a convenience. Listing of a particular bid is not a finding that such bid has been <br />)und to be responsive or accepted as complete by the City. An award of contract, if <br />ny, is subject to approval of the City Council and/or the City Manager. Contractors <br />hould refer to the contract documents for bidding information. <br />BID OPENING <br />DATE: Thursday, April 21, 2016 <br />TIME: 3:00 p.m. <br />LOCATION: City Clerk's Office <br />ENGINEER'S ESTIMATE <br />Date Approved: 3/24/2016 <br />Prepared by: <br />Rosas Brothers Construction <br />4731 Coliseum Way <br />Oakland, CA 94601 <br />Phone: (510) 534-1077 <br />Fax: (510) 534-5077 <br />JJR Construction, Inc. <br />1120 Ninth Avenue <br />San Mateo, CA 94402 <br />Phone: (650) 343-6109 <br />Fax: (650) 343-6207 <br />ITEM <br />NO: <br />ITEM QUANTITY <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />1 <br />Mobilization <br />1 LS <br />$50,000.00 <br />$50,000.00 <br />$8,000.00 <br />$8,000.00 <br />$30,000.00 <br />$30,000.00 <br />2 <br />Traffic Control per section 7-10.3. <br />1 LS <br />$40,000.00 <br />$40,000.00 <br />$8,000.00 <br />$8,000.00 <br />$55,000.00 <br />$55,000.00 <br />3 <br />Install Curb and Gutter per drawing <br />3,500 LF <br />$60.00 <br />$210,000.00 <br />$78.00 <br />$273,000.00 <br />$138.00 <br />$483,000.00 <br />100 case 3101 <br />4 <br />Install Sidewalk per drawing 100 <br />3,100 SF <br />$15.00 <br />$46,500.00 <br />$14.00 <br />$43,400.00 <br />$17.00 <br />$52,700.00 <br />case 3101 <br />5 <br />Install Wheelchair Curb Cut Ramp <br />24,000 SF <br />$18.00 <br />$432,000.00 <br />$19.50 <br />$468,000.00 <br />$21.00 <br />$504,000.00 <br />per drawing 106A and 106B case <br />3101 <br />6 <br />Install Concrete Apron per drawing <br />750 SF <br />$26.00 <br />$19,500.00 <br />$20.00 <br />$15,000.00 <br />$40.00 <br />$30,000.00 <br />114 case 3101 <br />7 <br />Install Surface Mounted Truncated <br />120 SF <br />$50.00 <br />$6,000.00 <br />$55.00 <br />$6,600.00 <br />$50.00 <br />$6,000.00 <br />Domes on (e) concrete surface per <br />drawing 106D case 3101 <br />8 <br />Install Decomposed Granite <br />2 TN <br />$1,500.00 <br />$3,000.00 <br />$600.00 <br />$1,200.00 <br />$1,500.00 <br />$3,000.00 <br />Hardscape per 308-9 <br />9 <br />Adjust Utility Valve Cover to grade <br />6 EA <br />$200.00 <br />$1,200.00 <br />$250.00 <br />$1,500.00 <br />$392.00 <br />$2,352.00 <br />or Utility Box to grade per 301.6 <br />10 <br />Relocate Utility Box per 307-2.4 <br />12 EA <br />$300.00 <br />$3,600.00 <br />$1,000.00 <br />$12,000.00 <br />$1,650.00 <br />$19,800.00 <br />11 <br />Relocate Pedestrian Push Button <br />2 EA <br />$1,200.00 <br />$2,400.00 <br />$2,600.00 <br />$5,200.00 <br />$2,875.00 <br />$5,750.00 <br />Post per 307-2.3 <br />12 <br />Install New Pedestrian Push Button <br />6 EA <br />$1,500.00 <br />$9,000.00 <br />$2,500.00 <br />$15,000.00 <br />$5,750.00 <br />$34,500.00 <br />Post Per 307-2.3 <br />13 <br />Relocate Traffic Signal 1 B Pole per <br />1 EA <br />$3,000.00 <br />$3,000.00 <br />$6,000.00 <br />$6,000.00 <br />$11,500.00 <br />$11,500.00 <br />307-2.3 <br />14 <br />Install 2 -inch Conduit per 307-2.5 <br />300 EA <br />$5.00 <br />$1,500.00 <br />$80.00 <br />$24,000.00 <br />$35.00 <br />$10,500.00 <br />Curb Ramp Upgrades 2015-16 Page 1 of 2 Printed 4/27/2016 @ 2:14 PM <br />