Laserfiche WebLink
Task 4—70% PS&E <br /> Consultant shall prepare the 70% PS&E documents after Design Coordination Meeting#1 based on <br /> comments received. Plans shall include: <br /> -Title sheet <br /> -Typical cross sections <br /> - Demolition and Utilities <br /> - Layout and Grading <br /> -Construction Details <br /> -Construction Staging <br /> -Traffic Handling/Detours <br /> -Signing and Striping <br /> - Planting Plan and Details <br /> - Irrigation Plan and Details <br /> -Construction Details for Planting and Irrigation <br /> Consultant shall conduct a final utility and right-of-way requirement analysis as part of Task 4 to identify the <br /> project needs/requirements and necessary steps to move forward with the project design. No right-of-way <br /> impacts are currently anticipated. <br /> The technical sections, parts 2 through 6,of the project specifications shall be prepared by the Consultant <br /> based on the Standard Specifications for Public Works Construction(Greenbook), 2006 edition and 2008 <br /> supplement thereto, to be combined with the front-end specifications to be prepared by City staff. <br /> Consultant shall also prepare standard special provisions (SSPs) based on the 2010 Caltrans Standard <br /> Specifications to address the Caltrans components for the subject project. <br /> Consultant shall prepare a cost estimate for the proposed improvements to reflect the design and details on <br /> the 70% plans. Specific bid items and precise quantities will be taken off and directly linked and supported <br /> by the individual technical specifications found in the Greenbook and/or the 2010 Caltrans Standard <br /> Specifications. <br /> The 70% PS&E shall undergo an in-house QA/QC (quality assurance/quality control) process prior to <br /> submittal to the City for review. The QA/QC process shall check the plans for conformance to standard <br /> construction practices and limitations and evaluate the constructability, cost-effectiveness and <br /> completeness of design features and methods proposed. The Consultant and their subconsultant shall <br /> conduct independent reviews of the PS&E. All in-house review comments will be reconciled and <br /> incorporated into the 70% PS&E package. <br /> The City will submit the 70% PS&E to Caltrans for review. <br /> Deliverables (due 8 weeks after Design Coordination Meeting#1): <br /> -70% plans in PDF and AutoCAD formats. Plans shall be 34" by 22" in size (ANSI D)on City title block <br /> -70%technical specifications in Microsoft Word <br /> -70%cost estimate in Microsoft Excel <br /> Task 5— 100% PS&E <br /> Consulting Services Agreement between City of San Leandro and 3/25/2016 <br /> BKF Engineers Exhibit A—Page 18 of 24 <br />