My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2015 Caltrans (3)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2015
>
Agmt 2015 Caltrans (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2016 3:31:40 PM
Creation date
5/25/2016 3:31:36 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
12/19/2015
Retention
PERM
Document Relationships
Reso 2016-039
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA Contract No: 75LX293 <br /> DEPARTMENT OF TRANSPORTATION Sheet 8 of 10 <br /> December 19,2015 <br /> Exhibit A <br /> Fed Xing ID: 749743X <br /> CPUC ID: 001D-16.50 <br /> Scope of Work <br /> Street Name: Washington Avenue <br /> County: Alameda <br /> City: San Leandro <br /> Railroad: Union Pacific Railroad <br /> All modifications shall be in accordance with the CAMUTCD and CPUC General Orders. <br /> Scope of Work: <br /> • Reconstruct the south median island to channelize left turn movements from Washington Avenue to <br /> Chapman Road. <br /> • Reconstruct concrete sidewalk: <br /> • In the northwest quadrant remove existing sidewalk between the railroad warning device and the <br /> track and construct new sidewalk intersecting perpendicular to the track. <br /> • In the southwest quadrant extend the existing sidewalk parallel to the track until intersecting <br /> perpendicular at the crossing. <br /> • In the northeast quadrant extend the existing sidewalk parallel to the track until intersecting <br /> perpendicular at the crossing. <br /> • In the southeast quadrant remove existing sidewalk between the railroad warning device and the <br /> track and construct new sidewalk intersecting perpendicular to the track. <br /> • Install detectable warning tiles on all sidewalk approaches. <br /> • Install pedestrian channelization fencing. <br /> • Install R8-8 "DO NOT STOP ON TRACKS"sign on both approaches. <br /> al <br />
The URL can be used to link to this page
Your browser does not support the video tag.