Laserfiche WebLink
EXHIBIT A <br />SCOPE OF SERVICES <br />San Leandro –Joaquin Plaza <br />Scope of Work <br />PHASE II - Fabrication <br />Scope <br />The Studio for Public Spaces (SPS) will engage in the design/build process for the Joaquin <br />Plaza installation in San Leandro. This process will include a final round of prototyping to ensure <br />the design strategies are met for the desired lifespan of the installation. <br />Deliverables <br />Final Prototyping: <br />• Onsite, full scale prototype <br />• 1 Community meeting <br />Design Development: <br />• Plan and Elevations of Joaquin Plaza Installation <br />• Design Documentation of Joaquin Plaza Installation Graphics <br />• Detail and Structural Documentation for permitting <br />• Preliminary maintenance guidelines and documentation <br />Fabrication: <br />• Construction Documents of Final Design <br />• Fabrication and installation of Joaquin Plaza Installation <br />• Final Maintenance guidelines and documentation <br />Timeline ' <br />October 2015 – June 2016 <br />Fees <br />Total fees for this scope of work are $235,000 <br />Consulting Services Agreement between October 1, 2015 <br />City of San Leandro and Exploratorium—Exhibit A Page 1 of 1 <br />