Laserfiche WebLink
�o� 5AN �qy <br />O AtNFERlN<8 <br />_ " �IM�iFdQT��rQN <br />d�,opPO IIfKf9 4" ftSN<MtAfitlM'Rdg�'.-: <br />PROJECT TITLE: Annual Street Sealing 2015-16 <br />PROJECT NO.: 2016.0070 <br />BID NO.: 15-16.013 <br />BID SUMMARY <br />This document is a summary of bids received for the subject project and are <br />provided only as a convenience. Listing of a particular bid is not a finding that such <br />bid has been found to be responsive or accepted as complete by the City. An <br />award of contract, if any, is subject to approval of the City Council and/or the City <br />Manager. Contractors should refer to the contract documents for bidding <br />information. <br />BID OPENING <br />ENGINEER'S ESTIMATE <br />American Asphalt Repair & <br />Telfer Pavement Technologies <br />VSS International, Inc. <br />Resurfacing Co.,lnc. <br />4522 Parker Avenue, Suite 350 <br />3785 Channel Drive <br />DATE: Tuesday, May 24, 2016 <br />Date Approved: 4/25/2016 <br />24200 Clawiter Road <br />McClellan, CA 95652 <br />West Sacramento, CA 95691 <br />TIME: 3:00 p.m. <br />Prepared by: J. O'Driscoll <br />Hayward, CA 94545 <br />LOCATION: City Clerk's Office <br />Phone: (510) 723-0280 <br />Phone: (916) 383-1756 <br />Phone: (916) 373-1500 <br />Fax: (510) 723-0288 <br />Fax: (916) 383-4084 <br />Fax: (916) 373-0183 <br />ITEM <br />NO. <br />ITEM QUANTITY <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />BASE BID <br />1 <br />Mobilization, Staging & Stockpiling per <br />1 LS <br />$40,000.00 <br />$40,000.00 <br />$85,000.00 <br />$85,000.00 <br />$65,000.00 <br />$65,000.00 <br />$48,360.63 <br />$48,360.63 <br />Sections 7-8.4 & 9-3.4 <br />2 <br />Traffic Control And Construction Signs <br />1 LS <br />$45,000.00 <br />$45,000.00 <br />$55,000.00 <br />$55,000.00 <br />$115,000.00 <br />$115,000.00 <br />$80,780.00 <br />$80,780.00 <br />per Section 315 <br />3 <br />Distressed Pavement Repair (Dig <br />620 TN <br />$200.00 <br />$124,000.00 <br />$240.00 <br />$148,800.00 <br />$345.00 <br />$213,900.00 <br />$413.91 <br />$256,624.20 <br />Outs) per Section 302-3 <br />4 <br />Remove & Replace Existing <br />1 LS <br />$40,000.00 <br />$40,000.00 <br />$65,000.00 <br />$65,000.00 <br />$79,000.00 <br />$79,000.00 <br />$64,592.85 <br />$64,592.85 <br />Thermoplastic Stripes, Pavement <br />Markings and Markers per Sections <br />310 & 312 <br />5 <br />Microsurfacing (Final Quantity) per <br />4488 SY <br />$3.75 <br />$16,830.00 <br />$2.50 <br />$11,220.00 <br />$4.00 <br />$17,952.00 <br />$2.84 <br />$12,745.92 <br />Section 302-14 <br />6 <br />Asphalt Rubber Chip Seal (Final <br />57967 SY <br />$4.40 <br />$255,054.80 <br />$4.23 <br />$245,200.41 <br />$4.50 <br />$260,851.50 <br />$5.40 <br />$313,021.80 <br />Quantity) per Section 302-10 <br />7 <br />Emulsion Aggregate Slurry (Final <br />98696 SY <br />$2.25 <br />$222,066.00 <br />$2.00 <br />$197,392.00 <br />$1.65 <br />$162,848.40 <br />$2.60 <br />$256,609.60 <br />Quantity) per Section 302-4 <br />8 <br />Adjust Sanitary Sewer or Storm Water <br />8 EA <br />$1,800.00 <br />$14,400.00 <br />$1,000.00 <br />$8,000.00 <br />$1,150.00 <br />$9,200.00 <br />$3,150.00 <br />$25,200.00 <br />Manhole Frame and Cover to Grade <br />per Section 301-1.6 <br />9 <br />Adjust Survey Monument or Sanitary <br />8 EA <br />$1,500.00 <br />$12,000.00 <br />$1,000.00 <br />$8,000.00 <br />$1,000.00 <br />$8,000.00 <br />$2,100.00 <br />$16,800.00 <br />Sewer Lamphole Frame and Cover to <br />Grade per Section 301-1.6 <br />10 <br />Remove and Reinstall Speed <br />3 EA <br />$2,000.00 <br />$6,000.00 <br />$6,000.00 <br />$18,000.00 <br />$6,000.00 <br />$18,000.00 <br />$6,300.00 <br />$18,900.00 <br />Cushions per Section 312-5 <br />Annual Street Sealing 2015-16 Page 1 of 3 Printed 5/25/2016 @ 8:30 AM <br />