<br />PROJECT TITLE: Annual Street Sealing 2015-16
<br />PROJECT NO.: 2016.0070
<br />BID NO.: 15-16.013
<br />BID SUMMARY
<br />This document is a summary of bids received for the subject project and are
<br />provided only as a convenience. Listing of a particular bid is not a finding that such
<br />bid has been found to be responsive or accepted as complete by the City. An
<br />award of contract, if any, is subject to approval of the City Council and/or the City
<br />Manager. Contractors should refer to the contract documents for bidding
<br />information.
<br />BID OPENING
<br />ENGINEER'S ESTIMATE
<br />American Asphalt Repair &
<br />Telfer Pavement Technologies
<br />VSS International, Inc.
<br />Resurfacing Co.,lnc.
<br />4522 Parker Avenue, Suite 350
<br />3785 Channel Drive
<br />DATE: Tuesday, May 24, 2016
<br />Date Approved: 4/25/2016
<br />24200 Clawiter Road
<br />McClellan, CA 95652
<br />West Sacramento, CA 95691
<br />TIME: 3:00 p.m.
<br />Prepared by: J. O'Driscoll
<br />Hayward, CA 94545
<br />LOCATION: City Clerk's Office
<br />Phone: (510) 723-0280
<br />Phone: (916) 383-1756
<br />Phone: (916) 373-1500
<br />Fax: (510) 723-0288
<br />Fax: (916) 383-4084
<br />Fax: (916) 373-0183
<br />ITEM
<br />NO.
<br />ITEM QUANTITY
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />BASE BID
<br />1
<br />Mobilization, Staging & Stockpiling per
<br />1 LS
<br />$40,000.00
<br />$40,000.00
<br />$85,000.00
<br />$85,000.00
<br />$65,000.00
<br />$65,000.00
<br />$48,360.63
<br />$48,360.63
<br />Sections 7-8.4 & 9-3.4
<br />2
<br />Traffic Control And Construction Signs
<br />1 LS
<br />$45,000.00
<br />$45,000.00
<br />$55,000.00
<br />$55,000.00
<br />$115,000.00
<br />$115,000.00
<br />$80,780.00
<br />$80,780.00
<br />per Section 315
<br />3
<br />Distressed Pavement Repair (Dig
<br />620 TN
<br />$200.00
<br />$124,000.00
<br />$240.00
<br />$148,800.00
<br />$345.00
<br />$213,900.00
<br />$413.91
<br />$256,624.20
<br />Outs) per Section 302-3
<br />4
<br />Remove & Replace Existing
<br />1 LS
<br />$40,000.00
<br />$40,000.00
<br />$65,000.00
<br />$65,000.00
<br />$79,000.00
<br />$79,000.00
<br />$64,592.85
<br />$64,592.85
<br />Thermoplastic Stripes, Pavement
<br />Markings and Markers per Sections
<br />310 & 312
<br />5
<br />Microsurfacing (Final Quantity) per
<br />4488 SY
<br />$3.75
<br />$16,830.00
<br />$2.50
<br />$11,220.00
<br />$4.00
<br />$17,952.00
<br />$2.84
<br />$12,745.92
<br />Section 302-14
<br />6
<br />Asphalt Rubber Chip Seal (Final
<br />57967 SY
<br />$4.40
<br />$255,054.80
<br />$4.23
<br />$245,200.41
<br />$4.50
<br />$260,851.50
<br />$5.40
<br />$313,021.80
<br />Quantity) per Section 302-10
<br />7
<br />Emulsion Aggregate Slurry (Final
<br />98696 SY
<br />$2.25
<br />$222,066.00
<br />$2.00
<br />$197,392.00
<br />$1.65
<br />$162,848.40
<br />$2.60
<br />$256,609.60
<br />Quantity) per Section 302-4
<br />8
<br />Adjust Sanitary Sewer or Storm Water
<br />8 EA
<br />$1,800.00
<br />$14,400.00
<br />$1,000.00
<br />$8,000.00
<br />$1,150.00
<br />$9,200.00
<br />$3,150.00
<br />$25,200.00
<br />Manhole Frame and Cover to Grade
<br />per Section 301-1.6
<br />9
<br />Adjust Survey Monument or Sanitary
<br />8 EA
<br />$1,500.00
<br />$12,000.00
<br />$1,000.00
<br />$8,000.00
<br />$1,000.00
<br />$8,000.00
<br />$2,100.00
<br />$16,800.00
<br />Sewer Lamphole Frame and Cover to
<br />Grade per Section 301-1.6
<br />10
<br />Remove and Reinstall Speed
<br />3 EA
<br />$2,000.00
<br />$6,000.00
<br />$6,000.00
<br />$18,000.00
<br />$6,000.00
<br />$18,000.00
<br />$6,300.00
<br />$18,900.00
<br />Cushions per Section 312-5
<br />Annual Street Sealing 2015-16 Page 1 of 3 Printed 5/25/2016 @ 8:30 AM