My WebLink
|
Help
|
About
|
Sign Out
Home
8M Consent 2016 0620
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0620
>
8M Consent 2016 0620
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2016 1:11:36 PM
Creation date
6/14/2016 4:00:32 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
6/20/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0620 CS + RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0620
Agmt 2016 4Leaf
(Reference)
Path:
\City Clerk\City Council\Agreements\2016
Agmt 2016 AHG Architectural
(Reference)
Path:
\City Clerk\City Council\Agreements\2016
Agmt 2016 TRB + Associates
(Reference)
Path:
\City Clerk\City Council\Agreements\2016
Reso 2016-082
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Staffing Capacity and Project Management <br />Building Solutions for Municipalities B-5 <br /> <br />TYPE OF PROJECT <br /> <br />TURNAROUND TIME* <br /> INITIAL CHECK <br />(WORKDAYS) <br />RECHECK <br />(WORKDAYS) <br />REVISION/PLAN <br />CHANGE <br />Single Family <br />Dwellings/Additions/Remodels <br /> <br />Within 10 <br /> <br />Within 5 <br /> <br />Within 5 <br />Tenant Improvements/Commercial/ <br />Industrial Projects <br /> <br />Within 10 <br /> <br />Within 5 <br /> <br />Within 5 <br />Complex Large Projects Within 15 Within 10 Within 10 <br />Expedited Within 5 Within 5 Within 5 <br /> <br /> <br />Building Plan Review Process <br /> <br />The following process represents our typical plan review workflow. Please note that this process can be <br />modified to meet the City’s specific needs. <br /> <br />Step 1 - Preliminary Discussions: Prior to beginning our initial plan review project for this contract term, <br />our Project Manager proposes to conduct a meeting or conference call with the City to verify local code <br />policies, documentation procedures, plan processing protocols, plan review checklist items, and <br />scheduling. <br /> <br />Step 2 – Initial Review: Once we receive a complete set of plan documents, we will perform our plan <br />review in the agreed-upon timeframe, checking for compliance to all applicable code standards (see <br />Turnaround Table below). <br /> <br />*Unless otherwise mutually agreed upon <br /> <br />All corrections are identified based on compliance with specified codes and regulations and worded so the <br />designer will know what needs attention and how to respond to the issue stated. Generally, corrections <br />are identified in two ways: <br /> <br />• Notes can be made on plans as appropriate and authorized to assist in locating the issue on the plans; <br />• A correction sheet is generated detailing what items need to be addressed before plans can be <br />approved. <br /> <br />The client will receive a copy of each correction list, as well as a cover memo containing the following: <br /> <br />• The date plans were reviewed by TRB+ Associates <br />• The date that the applicant/applicant’s designee was notified that the plan review was completed <br />• The name and phone number of the applicant/applicant’s designee that was notified that the plan <br />review was completed <br /> <br />City of San Leandro | Building Plan Check Services
The URL can be used to link to this page
Your browser does not support the video tag.