My WebLink
|
Help
|
About
|
Sign Out
Home
8M Consent 2016 0620
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0620
>
8M Consent 2016 0620
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2016 1:11:36 PM
Creation date
6/14/2016 4:00:32 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
6/20/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0620 CS + RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0620
Agmt 2016 4Leaf
(Reference)
Path:
\City Clerk\City Council\Agreements\2016
Agmt 2016 AHG Architectural
(Reference)
Path:
\City Clerk\City Council\Agreements\2016
Agmt 2016 TRB + Associates
(Reference)
Path:
\City Clerk\City Council\Agreements\2016
Reso 2016-082
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of San Leandro, Building and Safety Services <br />Attn.Jerome Smith Jr. Chief Building Official <br />835 East 14th Street <br />San Leandro, CA 94577 <br />With a copy to: <br />City of San Leandro <br />Department of Finance <br />c/o Purchasing Technician <br />835 East 14th Street <br />San Leandro, CA 94577 <br />10.11 Professional Seal. Where applicable in the determination of the contract administrator, the first <br />page of a technical report, first page of design specifications, and each page of construction <br />drawings shall be stamped/sealed and signed by the licensed professional responsible for the <br />report/design preparation. The stamp/seal shall be in a block entitled "Seal and Signature of <br />Registered Professional with report/design responsibility," as in the following example. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />_________________________________________ <br />Seal and Signature of Registered Professional with <br />report/design responsibility. <br /> <br /> <br /> <br />10.12 Integration. This Agreement, including the scope of work attached hereto and incorporated herein <br />as Exhibits A, B, and C represents the entire and integrated agreement between City and <br />Consultant and supersedes all prior negotiations, representations, or agreements, either written or <br />oral. <br />Exhibit A Scope of Services <br />Exhibit B Compensation Schedule & Reimbursable Expenses <br />Exhibit C Indemnification
The URL can be used to link to this page
Your browser does not support the video tag.