My WebLink
|
Help
|
About
|
Sign Out
Home
8M Consent 2016 0620
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0620
>
8M Consent 2016 0620
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2016 1:11:36 PM
Creation date
6/14/2016 4:00:32 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
6/20/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0620 CS + RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0620
Agmt 2016 4Leaf
(Reference)
Path:
\City Clerk\City Council\Agreements\2016
Agmt 2016 AHG Architectural
(Reference)
Path:
\City Clerk\City Council\Agreements\2016
Agmt 2016 TRB + Associates
(Reference)
Path:
\City Clerk\City Council\Agreements\2016
Reso 2016-082
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />City of Palo Alto, CA <br />Building Inspection, Permit Technician, Plan Review <br /> <br />Since 2007, 4LEAF has provided numerous combination inspectors to assist the City’s staff with performing <br />routine daily inspections for commercial and residential properties located throughout Palo Alto. Our inspection <br />services vary from full‐time to temporary part‐time staff to help augment vacation or extended absences due to <br />illness and/or market demand. <br /> <br />On‐Site Plans Examiners <br />Since 2010, 4LEAF has provided on‐site plans examiners for the City of Palo Alto. A majority of our plans <br />examiners are California‐Registered Engineers and are responsible for reviewing large projects under the <br />direction of the City’s Chief Building Official with values ranging between $100,000 and $50 Million. Projects <br />range from large commercial, restaurants, office parks, and custom residential projects. Some of our larger <br />projects include: <br /> <br />• Stanford Hospital (Parking Garage & Visitors) $32,000,000.00 <br />• Hilton Hotel (4 Stories and underground park) $18,022,200.00 <br />• Stanford School of Medicine (3165 porter) $17,098,981.00 <br />• VM Ware (Sitework P hase 3) $13,000,000.00 <br />• Stanford School of Medicine (3155 Porter) $12,709,237.00 <br /> <br />Inspection Services (Project Specific) <br />4LEAF provided the Project Inspector on the City of Palo Alto’s new Mitchell Park <br />Library and Community Center under Turner Construction Management. 4LEAF was <br />responsible for performing combination inspections for this LEED Gold Certification <br />project. The project consisted of a new 56,000 sq. ft. joint facility that replaces two <br />former facilities. The new Mitchell Park Library and Community Center is a highly <br />sustainable joint‐use facility that will be a vibrant destination for civic, cultural, social, <br />educational, and recreational activities. <br /> <br />4LEAF provided the building inspection services on the Taube‐Koret Campus for Jewish <br />Living. This project replaced the old Sun Microsystems campus and made way for a 8.6 <br />acre and $350 Million mixed‐used facility which included Senior Housing, Gymnasium, <br />in‐door and outdoor swimming pools, parking structure, theatre, school, etc. This <br />project was the recipient of several awards and was a huge benefit to the community. <br /> <br />4LEAF provided two full‐time inspectors to the new VMware campus. This project was <br />a $1.3 Billion expansion project at the Stanford Research Park. This project included the <br />construction of an extensive expansion and renovation of the existing corporate office <br />campus totaling approximately 800,000 sq. ft. and three (3) parking garage structures <br />totaling approximately 2,900 stalls. This project is pending LEED Certification. <br /> <br />Annual Contract Value: ~$2 Million <br /> <br />Client Name: City of Palo Alto <br />Client Reference: Peter Pirnejad, P.E., Director <br />Client Telephone: (650) 991‐8157 <br />Client Address: 285 Hamilton Ave. Palo Alto, CA 94301 <br />Email: Peter.Pirnejad@CityofPaloAlto.org
The URL can be used to link to this page
Your browser does not support the video tag.