Laserfiche WebLink
PERMIT NO. 1989.014.05 <br /> City of San Leandro <br /> (Originally Issued on March 7, 1990, As <br /> Amended Through May 2, 2016) <br /> AMENDMENT NO. FIVE <br /> Page 10 <br /> D. Limit of Work.The improvements authorized herein for the Shoreline Marshlands <br /> Enhancement Project (Water Circulation and Drainage Plan) shall be generally built in <br /> conformance with the plan entitled "San Leandro Shoreline Marshlands Enhancement Project" <br /> prepared by Andrew J. Leahy for the City of San Leandro, as revised through February 21, 1994. <br /> The final project plans shall be submitted for BCDC review in accordance with Special <br /> Conditions II.A and II.B. above. The riprap shoreline protection at the Bunker Marsh levee road <br /> shall be generally built in conformance with the revised plans dated July 11, 1994, prepared by <br /> the City of San Leandro. The riprap shoreline protection authorized in Amendment No. Four <br /> shall be generally built in conformance with the revised plans dated May 25, 2000 and prepared <br /> by the City of San Leandro (see Exhibit E). No changes to the design of the project shall be made <br /> without the prior written approval of the BCDC staff. <br /> E. Marsh Habitat Operations.The marsh habitat in the North Marsh, the Bunker Marsh <br /> and East Marsh shall be managed to provide high quality tidal wetlands consistent with the <br /> provisions of the 1992 Addendum to the Water Circulation and Drainage Plan. The marsh tide <br /> control structures shall be operated consistent with the recommendations of the 1992 <br /> Addendum to the Water Circulation and Drainage Plan, as may be modified as a result of <br /> recommendations stemming from the subsequent monitoring program included in the plan. No <br /> changes in the management of the marshes or the operations of the tidal culverts, which could <br /> possibly create adverse impacts to the value or function of the marsh habitats, shall be made <br /> without prior written approval by or on behalf of the Commission. <br /> F. Public Access <br /> 1. Area Required by Original Permit As Modified by Amendment No. Five. An <br /> approximately 381,300-square-foot area shall be dedicated as public access and is <br /> comprised of three distinct areas: <br /> a. Tthe approximately 28,900-square-foot area, along approximately 1,500 feet of <br /> shoreline as generally shown on Exhibit "A" as "San Leandro Marina Required <br /> Public Access Area <br /> b. The approximately 351,400-square-foot area of Shoreline Marshlands and <br /> Roberts Landing Slough as generally shown on Exhibit "B" including,—acrd the <br /> approximately 7-7500 7,600-foot-long(approximately 254,200 square feet) <br /> existing Shoreline Trail segment between Neptune Drive Bridge at the Estudillo <br /> Canal Bridge and the southern end of the North Marsh (segment 1), the <br /> approximately 1,500 2,100-foot-long(approximately 46,600 square feet) <br /> segment of an existing Shoreline tTrail that commences at a point approximately <br /> 350 feet east of Robert's Landing Slough Bridge and extends east to, and wraps <br /> • - - - = - - -• - - the north shore of San Lorenzo <br /> Creek (segment 2), and the approximately 2,100 2,000-foot-long (approximately <br />