Laserfiche WebLink
• <br /> PERMIT NO. 1989.014.05 <br /> City of San Leandro <br /> (Originally Issued on March 7, 1990, As <br /> Amended Through May 2, 2016) <br /> AMENDMENT NO. FIVE <br /> Page 12 <br /> b. Inclusion of an exhibit to the instrument(s)that clearly shows the areas to be <br /> reserved with a legally sufficient description of the boundaries of such areas; and <br /> c. Sufficiency of the instrument(s)to create legal rights in favor of the public for <br /> exclusive public access that will run with the land and be binding on any <br /> subsequent lessees, licensees, and users. <br /> Within 30 days after approval of the instrument(s) <br /> - - . - - - . : - = - : <, the permittee shall record the <br /> instrument(s)with Alameda County and shall provide evidence of recording to <br /> the Commission within 30 days after recordation. No changes shall be made to <br /> the instrument(s) after approval without the express written consent by or on <br /> behalf of the Commission. <br /> 3. Public Access Improvements. The original permit required the public access to be <br /> made available W within 180 days of the completion of the construction of the <br /> marsh restoration activities authorized in this amended permit, or by December 31, <br /> 1997,whichever is was earlier, the permittee shall install the following <br /> improvements: . _ : _ : . : . . : : : - - <br /> a. An approximately 1,515-foot-long concrete pedestrian pathway, 10 feet wide <br /> along the north dike, and between 6.5 and 9 feet wide along the west dike. The <br /> pathway shall connect to an existing sidewalk around the restaurant at the <br /> northwest corner of the marina; <br /> b. Approximately 20,500 square feet of landscaping along the pathway required by <br /> Special Condition II.F.3.a., above, including a strip bayward of the pathway, and <br /> planter boxes adjacent to the restroom facilities on the north and west dikes and <br /> at the pier entrances on the north dike; <br /> c. A landscape irrigation system; <br /> d. Public access amenities including a minimum of six benches,twelve concrete <br /> seatwalls, four drinking fountains, and fifteen bollard lights,the location of which <br /> are subject to plan review under Special Condition II-A of this permit; and <br /> e. At least two public access signs; one prominently located at the entrance to the <br /> marina on Neptune Drive, and one prominently located along the pedestrian <br /> pathway required by this permit. The exact locations shall be approved pursuant <br /> to Special Condition II-A; <br /> f. Along the approximately 7)-500 7,600 foot segment of the existing Shoreline Trail <br /> (segment 1), remove existing timber bollards within the asphalt trail along the <br /> east edge of the asphalt pavement, clear weedy vegetation within the combined <br />