My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2016134990
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2016
>
Inst 2016134990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 5:02:01 PM
Creation date
6/20/2016 5:01:59 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
5/2/2016
Recorded Document Type
_Other
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> PERMIT NO. 1989.014.05 <br /> City of San Leandro <br /> (Originally Issued on March 7, 1990, As <br /> Amended Through May 2, 2016) <br /> AMENDMENT NO. FIVE <br /> Page 32 <br /> N. Best Management Practices <br /> 1. Debris Removal.All construction debris shall be removed to an authorized location <br /> outside the jurisdiction of the Commission. In the event that any such material is <br /> placed in any area within the Commission's jurisdiction,the permittee(s), its <br /> assignees, or successors in interest, or the owner of the improvements, shall remove <br /> such material, at their expense, within ten days after they have been notified by the <br /> Executive Director of such placement. <br /> 2. Construction Operations.All construction operations shall be performed to prevent <br /> construction materials from falling, washing or blowing into the Bay. In the event <br /> that such material escapes or is placed in an area subject to tidal action of the Bay, <br /> the permittee(s) shall immediately retrieve and remove such material at its expense. <br /> 0. In-Kind Repairs and Maintenance.Any in-kind repair and maintenance work authorized <br /> herein shall not result in an enlargement of the authorized structural footprint and shall only <br /> involve construction materials approved for use in San Francisco Bay. Work shall occur during <br /> periods designated to avoid impacts to fish and wildlife. The permittee(s) shall contact <br /> Commission staff to confirm current restricted periods for construction. <br /> Executed at San Francisco, California, on behalf of the San Francisco Bay Conservation and <br /> Development Commission on the date first above written. <br /> LAWRENCE J. GOLDZBAND <br /> Executive Director <br /> San Francisco Bay Conservation and <br /> Devel Ipment Commission <br /> e., <br /> JAIME MICHAELS <br /> Chief of Permits <br /> JM/MSW/GO <br /> cc: U. S. Army Corps of Engineers,Attn.: Regulatory Functions Branch <br /> San Francisco Bay Regional Water Quality Control Board, <br /> Attn.: Certification Section <br /> Environmental Protection Agency <br /> East Bay Regional Park,Attn: Martin Vitz <br />
The URL can be used to link to this page
Your browser does not support the video tag.