My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2016134990
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2016
>
Inst 2016134990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 5:02:01 PM
Creation date
6/20/2016 5:01:59 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
5/2/2016
Recorded Document Type
_Other
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERMIT NO. 1989.014.05 <br /> City,of San Leandro <br /> (Originally Issued on March 7, 1990, As <br /> Amended Through May 2, 2016) <br /> AMENDMENT NO. FIVE <br /> Page 5 <br /> facilities in the Marina Facilities Replacement Project may might have be performed until <br /> January 1, 2010, as authorized by Sections I.A.1.a.(10) and I.A.2.a.(5) of this amended permit. <br /> Work authorized by Amendment No. Five must commence prior to October 1, 2016 and must <br /> be diligently pursued to completion by August 1, 2017. <br /> D. Project Summary. The Marina Facilities Replacement Project will result in a net increase <br /> in Bay fill of 26,132 square feet for new marina berths. Although the number of marina berths <br /> will decrease from 292 to 250,the new marina berths are larger, resulting in a greater area of <br /> pile-supported fill. The project includes a total of approximately 381,300-square-foot w",r ll-Festilt- <br /> • - - - . - :,"' - - . - -- - - public access in the form of a permanently <br /> guaranteed pedestrian pathway and landscaping along the north and west dikes, and public <br /> shore parking spaces at Lewelling Boulevard Traffic Circle. The project, as amended in <br /> Amendment No. Two,t-e-includes the Shoreline Marshlands Enhancement Project (Water <br /> Circulation and Drainage Plan), w ll-Fe;Rlt that resulted in a net increase in Bay fill of <br /> approximately 2,890 square feet, for the placement of culverts and shoreline protection within <br /> and along the existing shoreline levees, and the dredging of approximately 12,130 cubic yards <br /> of Bay muds,to enhance tidal water circulation on the inboard side of the shoreline levees for <br /> marsh habitat restoration. All dredged materials will be disposed of outside the Commission's <br /> jurisdiction. The project authorized in Amendment No. Two will also improved approximately <br /> 11,000 lineal feet of public access pathway, including a guaranteed north-south connection <br /> between the end of the existing paved shoreline trail and the footbridge at San Lorenzo Creek <br /> and a guaranteed east-west connection between the end of the existing, paved shoreline trail <br /> and Lewelling Boulevard.Amendment No. Four will result in an additional net increase in Bay <br /> fill of 2,900 square feet (230 cubic yards). Amendment No. Five will result in an increase of <br /> approximately 1,000-square-feet of dedicated public access and will provide enhanced public <br /> access to the Shoreline Marshlands and Robert's Landing Slough by providing six public shore <br /> parking spaces and enhanced bicycle and public access signage leading to the Shoreline Trail. <br /> E. Related Permit. BCDC Permit No. 1992.057.01, originally issued to Citation Homes <br /> Central and assigned to Heron Bay HOA, has identical public access requirements for the <br /> Shoreline Marshlands and Roberts Landing Slough public access area, as shown on Exhibit B to <br /> this Permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.