My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2016 TRB + Associates
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2016
>
Agmt 2016 TRB + Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 7:39:33 AM
Creation date
7/7/2016 2:50:04 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
6/20/2016
Retention
PERM
Document Relationships
8M Consent 2016 0620
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0620
Reso 2016-082
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THAssociates <br />Oakland Airport Connector (Building Services Division did not review this project, but was <br />involved jointly with the Oakland Fire Department in the planning stage on fire and safety <br />concerns) <br />The 3.2 -mile connector between the Coliseum/Oakland Airport Bart Station and the <br />Oakland airport terminal provides a transit alternative to airline passengers who opt to <br />use Bart to reach the airport instead of driving. The total project budget for the OAC <br />project is approximately $484 million. The connector running along the median of <br />Hegenberger Road has two end terminal stations: one at the Coliseum/Oakland Airport <br />BART Station and one at the proposed airport terminal. <br />Plan Review projects performed for the City of San Leandro <br />Costco (New retail store) <br />Bayfair Mall (Tenant improvements) <br />Century 21 Theatre <br />San Leandro Dialysis Clinic <br />Bay Area Veterinary Specialists (Pet hospital) <br />San Leandro Honda <br />San Leandro Nissan <br />San Leandro Hospital (Tenant improvements) <br />San Leandro Hospital (New doctors' office building) <br />Carlton Plaza of San Leandro (An assisted living facility) <br />Additional Plan Review projects performed <br />Costco Building Addition, City of Concord <br />New Gas Compressor Building, Butte County <br />AT&T Rooftop solar Panel Installation, City of San Ramon <br />Tilt -up Warehouse Buildings (2), City of Sacramento <br />Historic Building Seismic Retrofit, City of Benicia <br />Cancer Treatment Facility, City of Pleasant Hill <br />New Tri-Plex Building, Los Altos <br />TRB + Associates, Inc., Senior Plan Review Engineer, 2007 to present <br />City of Oakland, Supervising Civil Engineer (Building Division), 2000 — 2006 <br />City of San Leandro, Plan Check Engineer, 1973 — 2000 <br />City of San Leandro I Building Plan Check Services <br />Building Solutions for Municipalities <br />My <br />
The URL can be used to link to this page
Your browser does not support the video tag.