My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2016 TRB + Associates
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2016
>
Agmt 2016 TRB + Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 7:39:33 AM
Creation date
7/7/2016 2:50:04 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
6/20/2016
Retention
PERM
Document Relationships
8M Consent 2016 0620
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0620
Reso 2016-082
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRB Associates Experience <br />Terry Brown I Plans Examiner - Electrical & Fire Alarm <br />Terry Brown is an ICC certified electrical plans examiner and inspector with over 20 years of <br />Education experience encompassing engineering design, plan review, inspection, and building permit <br />administration. His building department experience includes serving as Assistant Electrical <br />Bachelor of Science Engineer for the City of Sacramento providing extensive Fire Alarm and Electrical plan reviews <br />Electrical Engineering on a variety of project es including high-rises, restaurants, tenant improvements, and <br />California State University Y P 1 tYP 9 9 � P <br />Sacramento mixed -occupancy buildings. <br />Realstration <br />ICC Certified Electrical <br />Plans Examiner (#5262060- Electrical/Fire Alarm Plan Review <br />E3) <br />ICC Certified Electrical Government / Civic <br />Inspector Social Security Office T.I.., Sacramento, CA <br />(#5262060-E2) Opus Baseball Complex, Sacramento, CA <br />Commercial <br />New Medical Research Facility, Walnut Creek, CA <br />Natomas East High -Rise, Sacramento, CA <br />Major Office Remodel (40,000 square feet), Pleasant Hill, CA <br />Residential <br />Saka Residence (30,000 square feet), Sacramento, CA <br />Industrial and Power Plant Cogeneration Facilities <br />SPG Solar Depot, Sacramento, CA <br />Tracy Water Treatment Plant, Tracy, CA <br />Raging Wire Substation, Sacramento, CA <br />Lodi Energy Center Project (Combined Cycle Power Plant), Lodi, CA <br />Russell City Energy Center Project, Hayward, CA <br />Almond 2 Power Plant, Ceres, CA <br />Hydraulic Engineering Design <br />Control systems for hydraulic elevators for JFK Airport, New York, NY <br />Split -Back Hydro project for Statue of Liberty, New York, NY <br />Work Experience <br />TRB + Associates, 2008 — Present <br />City of Sacramento, 2007-2008 <br />Bureau Veritas North America, Inc., 2005-2006 <br />Motion Control Engineering, 1998-2005 <br />City of San Leandro I Building Plan Check Services <br />Building Solutions for Municipalities C-25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.