My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2016 4Leaf
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2016
>
Agmt 2016 4Leaf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 7:37:59 AM
Creation date
7/7/2016 3:07:08 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
6/20/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0620 CS + RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0620
8M Consent 2016 0620
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0620
Reso 2016-082
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4LEAF} iNc. <br />ENGINEERNG • CONSTRUI.-MON MAfJAGE.1ENT <br />BUiLDING Ires cTIPN • PLAN CHECK <br />Building Inspection, Permit Technician, Plan Review <br />Since 2007, 4LEAF has provided numerous combination inspectors to assist the City's staff with performing <br />routine daily inspections for commercial and residential properties located throughout Palo Alto. Our inspection <br />services vary from full-time to temporary part-time staff to help augment vacation or extended absences due to <br />illness and/or market demand. <br />On -Site Plans Examiners <br />Since 2010, 4LEAF has provided on-site plans examiners for the City of Palo Alto. A majority of our plans <br />examiners are California -Registered Engineers and are responsible for reviewing large projects under the <br />direction of the City's Chief Building Official with values ranging between $100,000 and $50 Million. Projects <br />range from large commercial, restaurants, office parks, and custom residential projects. Some of our larger <br />projects include: <br />$32,000,000.00 <br />$18,022,200.00 <br />$17,098,981.00 <br />$13,000,000.00 <br />$12,709,237.00 <br />Inspection Services (Proiect Specific) <br />4LEAF provided the Project Inspector on the City of Palo Alto's new Mitchell Park <br />Library and Community Center under Turner Construction Management. 4LEAF was <br />responsible for performing combination inspections for this LEED Gold Certification`. <br />project. The project consisted of a new 56,000 sq. ft. joint facility that replaces two <br />former facilities. The new Mitchell Park Library and Community Center is a highly <br />sustainable joint -use facility that will be a vibrant destination for civic, cultural, social, <br />educational, and recreational activities. <br />4LEAF provided the building inspection services on the Taube-Koret Campus for Jewish <br />Living. This project replaced the old Sun Microsystems campus and made way for a 8.6 <br />i $. <br />acre and $350 Million mixed -used facility which included Senior Housing, Gymnasium, <br />in -door and outdoor swimming pools, parking structure, theatre, school, etc. This <br />project was the recipient of several awards and was a huge benefit to the community. <br />4LEAF provided two full-time inspectors to the new VMware campus. This project was <br />a $1.3 Billion expansion project at the Stanford Research Park. This project included the"3 <br />K 00161 <br />construction of an extensive expansion and renovation of the existing corporate office <br />campus totaling approximately 800,000 sq. ft. and three (3) parking garage structures <br />totaling approximately 2,900 stalls. This project is pending LEED Certification. <br />Annual Contract Value: —$2 Million <br />Client Name: City of Palo Alto <br />Client Reference: Peter Pirnejad, P.E., Director <br />Client Telephone: (650) 991-8157 <br />Client Address: 285 Hamilton Ave. Palo Alto, CA 94301 <br />Email: Peter. Pirneiad@CityofPaloAlto.ore <br />Qualifications to Provide Building Plan Check Services for the City of San Leandro <br />Page 5 of 13 <br />Section A: Statement of Qualifications and Interest <br />February 26, 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.