My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2016 4Leaf
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2016
>
Agmt 2016 4Leaf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 7:37:59 AM
Creation date
7/7/2016 3:07:08 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
6/20/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0620 CS + RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0620
8M Consent 2016 0620
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0620
Reso 2016-082
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Saeed "Sid" Danandeh, P.E., CBO, CASp <br />Plans Review Engineer <br />Experience Summary <br />Education Sid is an experienced plan review engineer and manager with more than <br />BS Civil Engineering 28 years of experience performing plan review. Sid has managed an <br />entire plan review operation for a large private firm which included <br />Registrations clientele in Northern and Southern California. Sid has worked on all <br />CA Registered Civil Engineer projects from small residential to high rises. Sid's project experience <br />SECB Structural Engineers <br />Certification Board, Chicago IL includes commercial and industrial projects such as stadiums, airports, <br />OR Registered Structural Engineer vessels, and malls. <br />Certifications <br />ICC Certified Building Official ICC Select Professional Experience <br />Certified Plans Examiner CASp <br />Certified Access Specialist 4LEAF, Inc. <br />City of Palo Alto <br />2013 — Present <br />Sid is currently serving the City of Palo Alto on behalf of 4LEAF <br />performing structural and non-structural reviews for such projects as <br />office campuses, tech buildings, OSHPD 3 projects, and other <br />commercial assignments. Projects typically range from approximately <br />$10 million to $100 million in construction valuation. Sid reviews work <br />for structural, mechanical, plumbing, electrical, disabled access, green <br />codes based on the 2010 an 2013 CBC, CGBC, CPC, CEC, CMC, and other <br />ordinances identified by the City. <br />West Coast Code Consultants (WC3) <br />City of San Jose <br />2013 <br />For approximately three weeks, Sid performed various reviews for the <br />City of San Jose before joining 4LEAF. <br />Bureau Veritas <br />Plan Review Manager <br />2011-2012 <br />Sid is the Project Manager for Bureau Veritas' Plan Review Engineering <br />Department. Sid is responsible for managing work in Northern and <br />Southern California which includes large commercial buildings, casinos, <br />medical buildings, and educational buildings. Sid reviews work for <br />structural, mechanical, plumbing, electrical, disabled access, green <br />codes based on the 2010 CBC, CGBC, CPC, CEC, CMC, and 2008 Energy <br />Code. <br />4LEAF, iNc. <br />1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.