Laserfiche WebLink
<br /> <br />BID OPENING DeSilva Gates Construction, L.P.Ghilotti Construction Company, Inc.PMK Contractors <br />DATE: Friday, June 24, 2016 Date Approved: 6/23/2016 11555 Dublin Boulevard 246 Ghilotti Avenue 1580 Chabot Court - 2nd Floor <br />TIME: 11:00 a.m.Prepared by:M. Goralka Dublin, CA 94568 Santa Rosa, CA 95407 Hayward, CA 94545 <br />LOCATION: City Clerk's Office Phone: (925) 829-9220 Phone: (707) 585-1221 Phone: (510) 674-2600 <br />Fax: (925) 803-4263 Fax: (707) 585-1601 Fax: (510) 674-2662 <br />ITEM <br />NO.ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COST ITEM COSTITEM COST <br />ENGINEER'S ESTIMATE <br />ITEM COST <br />PROJECT TITLE: <br />PROJECT NO.: <br />BID NO.: <br />QUANTITY <br />Annual Overlay/Rehabilitation 2015-16 <br />2016.0050 <br />15-16.016 <br />This document is a summary of bids received for the subject project and are <br />provided only as a convenience. Listing of a particular bid is not a finding that such <br />bid has been found to be responsive or accepted as complete by the City. An <br />award of contract, if any, is subject to approval of the City Council and/or the City <br />Manager. Contractors should refer to the contract documents for bidding <br />information. <br />28 AC Repair at Speed Cushion <br />locations per Section 316-1.1 <br />12 EA $1,000.00 $12,000.00 $3,000.00 $36,000.00 $2,500.00 $30,000.00 $4,040.00 $48,480.00 <br />29 Reinstall Existing Speed <br />Cushions per Section 316-1.2 <br />15 EA $750.00 $11,250.00 $1,000.00 $15,000.00 $1,300.00 $19,500.00 $1,460.00 $21,900.00 <br />30 Standard 6'-6" By 6'-8" Rubber <br />Speed Cushion per City Std Plan <br />131 A/B <br />29 EA $1,800.00 $52,200.00 $1,500.00 $43,500.00 $1,600.00 $46,400.00 $1,820.00 $52,780.00 <br />31 Standard 9'-2" By 6'-8" Rubber <br />Speed Cushion City Std Plan 131 <br />A/B <br />18 EA $2,500.00 $45,000.00 $1,800.00 $32,400.00 $2,000.00 $36,000.00 $2,260.00 $40,680.00 <br />32 Standard 10'-6" By 6'-8" Rubber <br />Speed Cushion City Std Plan 131 <br />A/B <br />4 EA $3,000.00 $12,000.00 $2,000.00 $8,000.00 $2,200.00 $8,800.00 $2,500.00 $10,000.00 <br />33 MUTCD Street Signage (W13-1 <br />"15MPH" / W17-1 "Speed Bump"/ <br />D11-1 "Bike Route") per City Std <br />Plan 131 A/B and 136 <br />20 EA $150.00 $3,000.00 $250.00 $5,000.00 $265.00 $5,300.00 $300.00 $6,000.00 <br />34 Relocate Existing Street Sign <br />Panels per City Std Plan 136 <br />3 EA $100.00 $300.00 $200.00 $600.00 $210.00 $630.00 $125.00 $375.00 <br />TOTAL BASE BID: <br />SUBCONTRACTORS: <br />AJW Construction Columbia Electric Griffin Soil <br />Columbia Electric Penhall Co.Columbia Electric <br />Pacific Northwest Oil Pacific Northwest Oil Chrisp Company <br />Griffin Soil Spirit Road Oils <br />Chrisp Company <br />Farwest Safety, Inc. <br />$2,128,745.00 <br />Chrisp Company TDW Construction, Inc. <br />$2,396,060.00 <br />TDW Construction, Inc. <br />$2,608,888.00 $2,857,000.00 <br />137