<br />
<br />BID OPENING DeSilva Gates Construction, L.P.Ghilotti Construction Company, Inc.PMK Contractors
<br />DATE: Friday, June 24, 2016 Date Approved: 6/23/2016 11555 Dublin Boulevard 246 Ghilotti Avenue 1580 Chabot Court - 2nd Floor
<br />TIME: 11:00 a.m.Prepared by:M. Goralka Dublin, CA 94568 Santa Rosa, CA 95407 Hayward, CA 94545
<br />LOCATION: City Clerk's Office Phone: (925) 829-9220 Phone: (707) 585-1221 Phone: (510) 674-2600
<br />Fax: (925) 803-4263 Fax: (707) 585-1601 Fax: (510) 674-2662
<br />ITEM
<br />NO.ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COST
<br />1 Mobilization and General
<br />Conditions per Section 9-3.4
<br />1 LS $100,000.00 $100,000.00 $230,000.00 $230,000.00 $200,000.00 $200,000.00 $459,470.00 $459,470.00
<br />2 Traffic and Pedestrian Control,
<br />Temp. Signage per Section 7-10.
<br />1 LS $125,000.00 $125,000.00 $230,000.00 $230,000.00 $195,103.00 $195,103.00 $255,000.00 $255,000.00
<br />3 Potholing per Section 306-0 60 EA $300.00 $18,000.00 $250.00 $15,000.00 $700.00 $42,000.00 $1,160.00 $69,600.00
<br />4 Concrete Valley Gutter per City
<br />Standard 114 and 303-5
<br />1,160 SF $30.00 $34,800.00 $30.00 $34,800.00 $40.00 $46,400.00 $30.00 $34,800.00
<br />5 Adjust City SDMH Covers to
<br />Grade per Section 301-1.6
<br />11 EA $2,000.00 $22,000.00 $2,000.00 $22,000.00 $2,000.00 $22,000.00 $2,530.00 $27,830.00
<br />6 Adjust City SSMH Frame and
<br />Cover to Grade per Section 301-
<br />1.6
<br />21 EA $2,000.00 $42,000.00 $2,000.00 $42,000.00 $2,000.00 $42,000.00 $2,530.00 $53,130.00
<br />7 Adjust Oro Loma SSMH Frame
<br />and Cover to Grade per Section
<br />301-1.6
<br />7 EA $2,000.00 $14,000.00 $2,000.00 $14,000.00 $2,000.00 $14,000.00 $2,530.00 $17,710.00
<br />8 Adjust SSCO to Grade per
<br />Section 301-1.6
<br />7 EA $1,000.00 $7,000.00 $1,400.00 $9,800.00 $1,200.00 $8,400.00 $1,620.00 $11,340.00
<br />9 Adjust City Monuments per
<br />Section 309
<br />19 EA $2,500.00 $47,500.00 $1,400.00 $26,600.00 $1,400.00 $26,600.00 $1,790.00 $34,010.00
<br />10 Remove and Rebuild City
<br />Monument per City Standard Plan
<br />Per Section 309
<br />5 EA $3,000.00 $15,000.00 $3,000.00 $15,000.00 $1,600.00 $8,000.00 $2,130.00 $10,650.00
<br />11 Adjust EBMUD Waver Valve lids
<br />to Grade per Section 301-1.6
<br />62 EA $1,500.00 $93,000.00 $800.00 $49,600.00 $800.00 $49,600.00 $1,110.00 $68,820.00
<br />12 Adjust PG&E Gas Valve lids to
<br />Grade per Section 301-1.6
<br />3 EA $1,500.00 $4,500.00 $1,400.00 $4,200.00 $1,200.00 $3,600.00 $1,620.00 $4,860.00
<br />13 Remove Material in Driveway
<br />Gutter Pan per Section 300-1
<br />18 EA $500.00 $9,000.00 $500.00 $9,000.00 $600.00 $10,800.00 $2,400.00 $43,200.00
<br />ITEM COSTITEM COST
<br />ENGINEER'S ESTIMATE
<br />ITEM COST
<br />PROJECT TITLE:
<br />PROJECT NO.:
<br />BID NO.:
<br />QUANTITY
<br />Annual Overlay/Rehabilitation 2015-16
<br />2016.0050
<br />15-16.016
<br />This document is a summary of bids received for the subject project and are
<br />provided only as a convenience. Listing of a particular bid is not a finding that such
<br />bid has been found to be responsive or accepted as complete by the City. An
<br />award of contract, if any, is subject to approval of the City Council and/or the City
<br />Manager. Contractors should refer to the contract documents for bidding
<br />information.
<br />135
|