My WebLink
|
Help
|
About
|
Sign Out
Home
4B1 Public Hearing 2016 0919
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0919
>
4B1 Public Hearing 2016 0919
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2016 3:00:58 PM
Creation date
9/13/2016 3:00:26 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
9/19/2016
Retention
PERM
Document Relationships
Reso 2016-117
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SAN LEANDRO GENERAL PLAN UPDATE FINAL EIR <br />CITY OF SAN LEANDRO <br />EXECUTIVE SUMMARY <br />LTS = Less Than Significant S = Significant SU = Significant Unavoidable Impact N/A = Not Applicable <br />2-20 AUGUST 2016 <br />TABLE 2-1 SUMMARY OF IMPACTS AND MITIGATION MEASURES <br />Impact <br />Significance <br />before <br />Mitigation Mitigation Measures <br />Significance <br />after <br />Mitigation <br />the findings of the San Leandro Shoreline Development Project <br />EIR) <br /> Restripe lanes on the west leg to provide two corresponding <br />receiving lanes. (Consistent with the findings of the San <br />Leandro Shoreline Development Project EIR) <br /> Provide an exclusive southbound right-turn lane to feed the <br />existing channelized right-turn lane from San Leandro <br />Boulevard southbound to Marina Boulevard westbound so <br />that southbound through traffic does not block access to the <br />channelized southbound right-turn lane. <br /> Optimize the traffic signal cycle length and splits in conjunction <br />with adaptive traffic control technology. <br />Upon implementation of these measures, intersection operations <br />would improve to LOS D during the AM and PM peak hours. The <br />availability of right-of-way for the required widening on the south <br />and north legs of the intersection is uncertain; therefore, the <br />measure may be infeasible. Consequently, the Cumulative with <br />proposed Plan impact remains significant and unavoidable. <br /> San Leandro Boulevard and Davis Street (#17): The addition of <br />Cumulative with proposed Plan traffic would cause the <br />intersection level of service to degrade from LOS C to LOS F in the <br />AM peak hour and LOS C to LOS E in the PM peak hour. <br />Therefore, the Cumulative with Proposed Plan impact is <br />considered to be significant. <br />Implementation of the following measures would improve <br />intersection operations during the AM and PM peak hours to <br />LOS D: <br /> Add a northbound right-turn lane on San Leandro Boulevard to <br />provide two exclusive left-turn lanes, two exclusive through <br />lanes and one exclusive right-turn lane. <br /> Optimize the traffic signal cycle length and splits in conjunction <br />with adaptive traffic control technology. <br />Because this intersection is within the Downtown Transit <br />Oriented Development PDA, the degradation of intersection
The URL can be used to link to this page
Your browser does not support the video tag.