My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2016205069
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2016
>
Inst 2016205069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2017 9:57:42 AM
Creation date
9/16/2016 4:36:54 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
8/15/2016
Recorded Document Type
Agreement to Conditions
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. The proposed development shall comply with City ordinances, policies and <br />regulations. All improvements shall be in accordance with the City's Design <br />Standards, Specifications and Standard Plans unless otherwise specifically <br />approved by the City Engineer. <br />C. The applicant shall remove broken and uplifted sidewalk along the full project <br />frontage on Fargo Avenue and shall construct new sidewalk in the same location <br />and alignment as the existing facilities prior to issuance of Certificate of <br />Occupancy. <br />D. The applicant shall remove and replace both the driveways to be ADA compliant. <br />Minimum 4' of driveway width shall be at maximum 2% cross slope. Refer to <br />City of San Leandro standard Plans Dwg. 102 Case 3 10 1. <br />E. The applicant shall obtain an Encroachment Permit from the Engineering and <br />Transportation Department for any work within the public right-of-way including <br />the use of lifting equipment or the staging of materials. Barricades, traffic cones, <br />and/or caution ribbon shall be positioned around any equipment or materials <br />within the right-of-way to provide a barrier to public access and assure public <br />safety. Any damage to the right-of-way improvements must be promptly repaired <br />by the applicant according to City adopted standards. <br />IV. ENVIRONMENTAL SERVICES REQUIREMENTS <br />A. Discharge of anything other than rainwater to the stormwater collection system, <br />which includes area drains, sidewalks, parking areas, street curb and gutter, is <br />strictly prohibited. <br />B. Container Management of Trash, Solid Waste and/or Recyclables shall be <br />required to prevent exposure to or contamination of rainwater, creating illicit <br />discharges or impacting receiving surface waters. <br />C. The elimination of exposure of materials, processes or equipment to the maximum <br />extent practicable is necessary to prevent contamination of rainwater. Exposures <br />that cannot be eliminated require use of Best Management Practices (BMPs), both <br />engineered and administrative, to prevent remaining exposures from impacting <br />rainwater runoff. <br />V. PUBLIC WORKS REQUIREMENTS <br />A. Solid Waste Service Requirement — Applicant is required to have sufficient <br />number and size of containers for all solid waste generated (garbage, recycling <br />and organics). <br />B. Recycling Requirements — Applicant is subject to Alameda County Mandatory <br />Recycling Ordinance #2012-01. For more information, visit <br />www.RecyclingRulesAC.org. Make note Applicant will also be required to <br />provide space for organics bin(s). <br />Agreement to Conditions June 16, 2016 <br />PLN16-0026 Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.