My WebLink
|
Help
|
About
|
Sign Out
Home
8L Consent 2016 1003
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 1003
>
8L Consent 2016 1003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 10:23:42 AM
Creation date
9/28/2016 10:23:41 AM
Metadata
Document Relationships
Reso 2016-128
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of San Leandro <br />Meeting Date: October 3, 2016 <br />Staff Report <br />Agenda Section:File Number:16-389 CONSENT CALENDAR <br />Agenda Number:8.L. <br />TO:City Council <br />FROM:Chris ZapataCity Manager <br />BY:Keith Cooke <br />Engineering & Transportation Director <br />FINANCE REVIEW:David Baum <br />Finance Director <br />TITLE:Staff Report for a Resolution Accepting the Work for the San Leandro <br />Boulevard Rehabilitation Williams Street to Hudson Lane Project; Project No. <br />2014.0420 <br />SUMMARY AND RECOMMENDATIONS <br />Staff recommends acceptance of the work, filing of the Notice of Completion, and authorizing <br />the City Manager to release the performance and payment bonds, and to release the <br />maintenance bonds for the subject project upon successful completion of the one-year <br />maintenance period. <br />BACKGROUND <br />On July 27, 2015, by Resolution No. 2015-144, the City Council awarded the construction <br />contract for the subject project to DeSilva Gates Construction, L.P. The project reconstructed <br />the asphalt concrete section of the roadway, replaced traffic lane stripes and installed <br />enhanced green bike lane stripes at major intersections within the project limits from Williams <br />Street to Hudson Lane/Polar Way. In addition, the project upgraded substandard curb ramps <br />at San Leandro Boulevard intersections at Castro Street and at Harlan Avenue. The project <br />also installed rectangular rapid flashing beacons on the crosswalk at the intersection of San <br />Leandro Boulevard and Castro Street and repaired failed sanitary sewer lines within the <br />project limits. <br />Approximately one half of the funds for this project were provided by a Federal grant; the City <br />has now met its grant obligation with the construction of the project. <br />Analysis <br />The project construction has been completed in accordance with the contract documents and <br />City standards. <br />Page 1 City of San Leandro Printed on 9/27/2016
The URL can be used to link to this page
Your browser does not support the video tag.