My WebLink
|
Help
|
About
|
Sign Out
Home
Ord 2016-012
CityHall
>
City Clerk
>
City Council
>
Ordinances
>
2016
>
Ord 2016-012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2017 10:07:01 AM
Creation date
10/28/2016 4:09:41 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Ordinance
Document Date (6)
10/3/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 1003 RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 1003
8I Consent 2016 1003
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 1003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
vided on the amount, sources, and types of hazardous wastes to be treated <br />based on an actual survey of the industries to be served and, thereby, be repre- <br />sentative of the wastes that will be processed at the facility. <br />10. A plan that clearly delineates all public involvement with the proposed project pri- <br />or to any formally advertised and scheduled public hearings. Said plan will pro- <br />vide for adequate public testimony on the project in an effort to mitigate all public <br />concerns prior to the approval body reviewing the case. <br />11. A plan that identifies an ongoing monitoring program to ensure no unintentional <br />release of any hazardous substance from the site. This shall include any ongoing <br />monitoring necessary by other permitting agencies such as State Department of <br />Health Services, the Bay Area Air Quality Management District (BAAQMD), Envi- <br />ronmental Protection Agency (EPA), San Francisco Bay Regional Water Quality <br />Control Board, etc. <br />12. A preliminary contingency plan for emergency procedures designed to minimize <br />hazards to human health or the environment from fires, explosions, or any un- <br />planned sudden or non -sudden release of hazardous waste or hazardous waste <br />constituents to air, soil, or surface water. The plan shall provide for its immediate <br />implementation whenever there is a fire, explosion, or release of hazardous <br />waste constituents, which could threaten human health or the environment. The <br />preliminary contingency plan shall address the requirements included in Section <br />4-1684.G.3. <br />13. Other information as required by the Community Development Director to <br />demonstrate compliance with the facility siting criteria as outlined in Section 4- <br />16845. <br />E. Environmental Review. <br />1. The project shall be subject to environmental analysis according to the City's en- <br />vironmental guidelines pursuant to the California Environmental Quality Act (Pub- <br />lic Resources Code Sections 21000-21177; 15000-15387). <br />2. The environmental analysis shall address, but not be limited to, the following: <br />a. Describe at least two (2) reasonable alternative sites to the project; these al- <br />ternatives shall be reviewed pursuant to the California Environmental Quality <br />Act [Public Resources Code, Section 15060(d)]. <br />b. An analysis of visual, noise, and any olfactory impacts associated with the <br />project and recommended mitigation measures. <br />Ordinance , Exhibit D: Amended Article 16 <br />Note: underlined and bolded text represents new text; s#ike thFOugh represents text to be eliminated <br />
The URL can be used to link to this page
Your browser does not support the video tag.