My WebLink
|
Help
|
About
|
Sign Out
Home
8B Consent 2016 1107
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 1107
>
8B Consent 2016 1107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 11:27:24 AM
Creation date
11/2/2016 11:27:21 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
11/7/2016
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Traffic Impact Oral Response During the Meeting <br />There are two southbound lanes from Foothill Blvd at the intersection. Cars on the right lane currently <br />also turn left. Traffic enforcement by SLPD is needed. <br />The double left turn will be eliminated with the roundabout project. <br />(Update: The double left-turn movement is legal with the existing <br />signage and striping. The Traffic Division of the Engineering and <br />Transportation Department will review the intersection and decide if <br />some additional signage and/or striping is needed prior to construction <br />of the roundabout) <br />There is currently illegal dumping of trash on Foothill Blvd north of the intersection within the City of <br />Oakland. <br />Councilmember Lopez is currently working with the City of Oakland to <br />address this problem. <br />Will roundabout help address crime stemming from the liquor store adjacent to the intersection?The roundabout design does not include crime mitigation. <br />A roundabout was installed over a decade ago on Maud Ave and that did not work well and was removed. <br />How is this project different from the one on Maud Ave? <br />The lack of space on Maud Ave caused the roundabout to fail. A <br />roundabout should be feasible at the intersection of Superior/MacArthur <br />based on the studies done for this intersection. <br />Will roundabout education be provided?We will take this into consideration. At a minimum, new signage and <br />striping will educate drivers as to what to do as they approach the <br />roundabout. <br />Page 4 of 4
The URL can be used to link to this page
Your browser does not support the video tag.