Laserfiche WebLink
<br />Consulting Services Agreement between City of San Leandro and 10/18/2016 WRECO for Annual Street Overlay/Rehabilitation 2016-17 Project Exhibit A – Page 1 of 5 <br />EXHIBIT A SCOPE OF SERVICES Project Description The City of San Leandro annually allocates funds toward street maintenance and rehabilitation. The total budget for the Annual Street Overlay/Rehabilitation 2016-17 Project, including design, construction, inspection, construction management, and contingency is $5,965,000. The project will include 17 street segments, two of which will be a complete reconstruction. The project will be divided into two separate bid packages. Bid Package #1 <br />Mill and Fill Streets <br />Street Name Start Location End Location <br />Estabrook Street House #62 Washington Avenue <br />Estabrook Street East 14th Street House #62 <br />Fairbanks Street Barrow Street Sitka Street <br />Longview Drive Astor Drive Skyview Drive <br />O'Donnell Avenue Reynolds Street Grover Cleveland Park <br />San Leandro Boulevard North City Limits San Leandro Creek <br />Teagarden Street Alvarado Street 1000' w/o Alvarado Bid Package #2 <br />Mill and Fill Streets <br />Street Name Start Location End Location <br />Arena Street Laverne Avenue Elvina Drive <br />Belleau Street Marne Street Maureen Street <br />Del Mar Circle Portola Drive Cul de Sac <br />Hesperian Boulevard Thornally Drive CV Freeway <br />Marne Street Breckenridge Street Belleau Street <br />Vining Drive Farnsworth Street Cranbrook Street <br />Washington Avenue 60' s/o Anza Way Springlake Drive <br />Washington Avenue Springlake Drive 880 Off Ramp <br /> Reconstruction Streets <br />Street Name Start Location End Location <br />Arena Street Mendocino Street Laverne Drive <br />Kappa Avenue Laverne Drive Elvina Drive