My WebLink
|
Help
|
About
|
Sign Out
Home
8G Consent 2016 1107
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 1107
>
8G Consent 2016 1107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 11:27:35 AM
Creation date
11/2/2016 11:27:31 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
11/7/2016
Retention
PERM
Document Relationships
Reso 2016-151
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and 09/22/16 <br />Alta Planning + Design, Inc. for Bicycle and Pedestrian Master Plan Update Exhibit A - Page 5 of 14 <br />3.4 - COMPLETE STREET & ACTIVE TRANSPORTATION BEST PRACTICES <br />The best way to succinctly demonstrate the potential for bicycling and walking in San Leandro is to visually <br />display the range of facility types that can be implemented. Using images and descriptions from Alta’s <br />involvement in the creation of the NACTO Urban Bikeway Design Guide, as well as the NACTO Urban <br />Street Design Guide, FHWA’s Achieving Multimodal Networks, and other recent design guidelines, Alta will <br />provide a review of best practices from California and around the country that are specifically applicable to <br />San Leandro. <br />3.5 - CONFORMANCE WITH FUNDING REQUIREMENTS <br />Alta will prepare a table summarizing how the plan satisfies each of Caltrans’ Active Transportation <br />Program (ATP) requirements and ACTC Bicycle Master Plan Core Elements. This table will allow for a <br />quick review of the plan’s conformance to funding requirements, thus avoiding the need to search <br />throughout the document for the various applicable sections. Alta will provide this table at the beginning of <br />the document or as one of the appendices. Caltrans have approved all of Alta’s bicycle and pedestrian <br />plans in California, and Alta is expert at ensuring that each local agency qualifies for ATP and other <br />funding. <br />3.6 - COMMUNITY INVOLVEMENT IN PLAN <br />Alta will summarize community involvement in the plan update, including the date, location, and times of <br />the BPAC, Planning Commission, Facility & Transportation Committee, and City Council meetings, as well <br />as the attendance and efforts to market the meeting. Alta will document specific feedback from the public <br />identified in Task 5. <br />3.7 - RECENT PROJECT & PROGRAM EXPENDITURES <br />Documenting successful projects completed between the previous plan and current update can go a long <br />way in inspiring enthusiasm among stakeholders. Alta will summarize annual bicycle and pedestrian <br />expenditures in San Leandro and will illustrate recently completed projects per ATP requirements. <br />TASK 3.8 - GOALS & POLICIES <br />The Plan’s goals, policies, and objectives will support the Plan’s vision and set the foundation for project <br />development, prioritization, and implementation. Based on feedback received at the Kick-off Meeting and <br />the first BPAC meeting, Alta will update the list of goals, ensuring they match with citizens’ needs, <br />overarching City goals, and county and state guidelines. Each goal will be paired with a series of related <br />policies or objectives by which to accomplish the goal. <br />This task will be summarized in an administrative draft technical memorandum. The City will provide one <br />internally-consistent, consolidated list of edits, which will be incorporated into a working group draft <br />memorandum. The City will review and approve one internally-consistent, consolidated list of edits from the <br />working group, which will be incorporated into the final draft memorandum and compiled into the Initial Draft <br />Bicycle and Pedestrian Master Plan, described in Task 8. <br />Task 3 Deliverables: <br /> Vision and Goals Technical Memorandum (Administrative, Working Group, and Final Drafts) <br />Task 4 - Existing Conditions <br />Alta will illustrate and document existing bicycle and pedestrian conditions in San Leandro in compliance <br />with ATP requirements. Using City provided data, Alta will map existing bicycle facilities and regional <br />connections (along with highlighting the total miles of bikeways in San Leandro), support facilities (including
The URL can be used to link to this page
Your browser does not support the video tag.