My WebLink
|
Help
|
About
|
Sign Out
Home
8G Consent 2016 1107
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 1107
>
8G Consent 2016 1107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 11:27:35 AM
Creation date
11/2/2016 11:27:31 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
11/7/2016
Retention
PERM
Document Relationships
Reso 2016-151
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 16-548 <br />Staff recommends the appropriation of Measure B Bicycle and Pedestrian funds of <br />$40,000.00 to supplement the $70,000.00 of previously appropriated funds. The <br />appropriation will fund the total CSA cost ($77,038.00) as well as staff time ($13,702.50) and <br />contingency for amendments to the CSA ($19,259.50). <br /> <br />Budget Authority <br />Current funding for the Bicycle and Pedestrian Master Plan Update is $70,000.00 in account <br />no. 141-36-351, appropriated in the 2016-17 budget. <br />Staff is requesting City Council approve an additional appropriation needed for this project of <br />$40,000.00 for account no. 141-36-351, in 2016-17 from fund balance. <br />ATTACHMENT(S) <br />·CSA - Alta Planning + Design, Inc. <br />PREPARED BY: Reh-Lin N. Chen, Senior Transportation Engineer, Engineering and <br />Transportation Department <br />Page 4 City of San Leandro Printed on 11/1/2016
The URL can be used to link to this page
Your browser does not support the video tag.