My WebLink
|
Help
|
About
|
Sign Out
Home
4A Public Hearings 2016 1121
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 1121
>
4A Public Hearings 2016 1121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2016 5:07:38 PM
Creation date
11/16/2016 5:07:30 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
11/21/2016
Retention
PERM
Document Relationships
Reso 2016-153
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 16-629 <br />Section 1704.6.1 of the 2016 Edition of the California Building Code is amended by adding <br />new item 6 and exception to read as follows: <br />6. Structural observations of the lateral system shall be provided for all new <br />commercial, industrial, and multifamily buildings and all new single family <br />dwelling on hillsides. <br />Exception: Structural observations of the lateral system may be waived for one and two-story <br />wood residential structure when such structures are in full compliance with conventional light <br />frame construction of Chapter 23 of the California Building Code or the California Residential <br />Code. <br />SECTION 7-5-175: SOILS AND FOUNDATIONS <br />Sections 1803.8, 1803.9 and 1803.10 are added to the 2016 California Building Code to <br />read: <br />1803.8 Review. Before issuing a permit for a building where soil and foundation investigation <br />is required, the Geotechnical Engineer or Civil Engineer in responsible charge of the soil <br />investigation shall state in writing (must be signed and stamped): <br />1. The plans and specifications substantially conform to the recommendations in the soil <br />investigation. <br />2. The Geotechnical Engineer or Civil Engineer in responsible charge of the soil investigation <br />has been retained to provide soil site observation and provide periodic and final reports to the <br />city. <br />1803.9 Field Report. Before requesting a foundation inspection from the City, the <br />Geotechnical Engineer or Civil Engineer in responsible charge of the soil investigation shall <br />provide a written field report stating: <br />1. The building pad was prepared and compacted in accordance with the soil report and <br />specification. <br />2. The foundation or pier excavation, depth, backfill materials, and drainage (if applicable), <br />substantially conforms with the soil report and approved plans. <br />1803.10 Final Report. Before final inspection for any building or structure, the Geotechnical <br />Engineer or Civil Engineer in responsible charge of the soil investigation shall issue a final <br />report stating the completed pad, foundation, finish grading, drainage, and associated site <br />work substantially conforms to the approved plans, specifications, and investigation. <br />SECTION 7-5-180: CONCRETE AND MASONRY FOUNDATION WALLS <br />Section 1807.1.6 of the 2016 Edition of the California Building Code is amended to read as <br />follows: <br />1807.1.6 Prescriptive design of concrete and masonry foundation walls. Concrete and <br />masonry foundation walls that are laterally supported at the top and bottom shall be permitted <br />Page 9 City of San Leandro Printed on 11/15/2016
The URL can be used to link to this page
Your browser does not support the video tag.