Laserfiche WebLink
Alameda CTC Agreement No. A16-0079 <br />Project No. 1468.020 <br /> <br />Appendix A – Page 8 <br />APPENDIX A-7 <br />PERMITS/AGREEMENTS/COORDINATING AGENCIES <br /> <br />The project will be managed by the City of San Leandro and no inter-agency arrangements are necessary for <br />this project. City staff will either design the improvements or manage a consultant who designs the <br />improvements. There are no right of way needs associated with this work; however, temporary easements <br />may be required to construct ADA ramps. The work will be constructed by outside contractors selected <br />through a public and competitive bid or bids. Bidding and construction will be managed by City staff, <br />inspection of the work will also be done by City staff. Special inspection or testing, if needed, will be done by <br />a consultant. <br /> <br />