My WebLink
|
Help
|
About
|
Sign Out
Home
4A Public Hearings 2016 1219
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 1219
>
4A Public Hearings 2016 1219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2016 3:00:38 PM
Creation date
12/13/2016 3:00:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
12/19/2016
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Recommended Conditions of Approval October 20, 2016 <br />PLN16-0009; Heron Bay Page 3 of 4 <br />3. Utility connections for electricity, gas, water and sewer shall be shown on the drawings. <br />Label or create a legend for all the utility lines. Refer to previous utility drawings for <br />reference. <br /> <br />4. The kiosk location shall be shown be shown on the drawings with respect to existing joint <br />utility trench. Joint Trench Composite Plan is on record with the City of San Leandro, <br />Engineering and Transportation Department, Case 1201 Drawings 509 and 510. <br /> <br />5. The surface in the Anchorage Drive drivable barrier shall show that it can support a <br />minimum of 75,000 pounds, to the satisfaction of the Alameda County Fire Department. <br /> <br />VI. PUBLIC WORKS DEPARTMENT REQUIREMENT <br /> <br />A. Passage rights shall be maintained for City of San Leandro Public Works Environmental <br />Services Inspectors for performing inspections of the Alameda County Pump Station or <br />Livermore Amador Valley Water Management Association (LAVWMA) pump station, <br />which are located within Heron Bay, and for responding to spills or illicit discharge <br />complaints either when within Heron Bay or when needing to access the marsh area <br />adjacent to Heron Bay. <br /> <br />V. FENCING AND SCREENING REQUIREMENTS <br /> <br />A. Electrical, gas, and water meters shall be located such that they will not be visible from <br />the street, or these units shall be screened or enclosed. The screen or enclosure shall be <br />painted to match the color of the exterior building wall that it is affixed to. <br /> <br />B. Barbed or razor wire shall not be installed on any fence, wall or building on the project <br />site. <br /> <br />VI. MAINTENANCE <br /> <br />A. The project site shall be well maintained and shall be kept free of litter, debris and weeds at <br />all times; during construction, the site shall be well maintained and shall be kept free of <br />litter, debris and weeds. <br /> <br />B. Any graffiti shall be promptly removed from building walls, perimeter soundwalls and/or <br />fences.. <br /> <br />C. All landscaping improvements shall be maintained in a healthy, growing condition at all <br />times. <br /> <br />VII. CONSTRUCTION PROVISIONS <br /> <br />A. Construction on the project site shall not commence prior to 7:00 a.m. and shall cease by <br />7:00 p.m., Monday through Friday, and shall not commence prior to 8 a.m. and shall <br />cease by 7 p.m. Saturday and Sunday, unless otherwise approved by the Chief Building <br />Official. There shall be no construction on Federal holidays. Interior construction such as <br />sheet rock taping and texturing, painting, tile installation and similar activity shall be
The URL can be used to link to this page
Your browser does not support the video tag.