<br />Production Casing Installation, Seal, and Development Observation – At critical times, observe reaming of <br />the pilot hole, installation of the production casing and screens, test pumping, and other well development <br />operations. Laboratory fees for water quality analyses of samples collected during the pumping tests are <br />not included as part of this task. <br /> <br />Aquifer Test Analysis and Summary Report Preparation – Determine a safe sustained yield for the well. <br />Prepare a completion report summarizing information gathered during well construction and testing, <br />including an as-built construction diagram of the well. <br /> <br />5.08 Substantial Completion Review <br />Harris Design will conduct an inspection to determine if the work is substantially complete, and will prepare <br />a punch list of incomplete or unacceptable work items. Should the project be determined by Harris Design <br />to be substantially complete, a notice of substantial completion will be prepared and issued to the City so <br />they can issue it as necessary to the Contractor. <br /> <br />Deliverable shall be a list of items to be included on the City’s punch list to be issued to the Contractor. <br /> <br />5.09 Follow-Up Substantial Completion Review <br />Should the project not be determined to be substantially complete, the Contractor shall satisfactorily <br />complete the punch list items and issue a notice that all punch list items have been completed. Upon <br />receipt of this notice, a second review will be held to determine if the completed work is acceptable. Once <br />the work has been deemed substantially complete, Harris Design will recommend to the City that notice <br />shall be given to the Contractor indicating authorization to begin the maintenance period. Any further <br />reviews necessary to deem the project substantially complete shall be provided as additional services. <br /> <br />5.10 Final Review <br />Not included. City staff will inspect the site at the end of the project maintenance period. <br /> <br />5.11 Review Contractor-Supplied Verifications and Supplemental Information <br />Receive and review maintenance and operating instructions, schedules, irrigation controller charts, and <br />guarantees, which are to be assembled by the Contractor in accordance with the Construction Contract <br />Documents. Such review will only be to determine that their content complies with the requirements of the <br />Construction Contract Documents. <br /> <br />5.12 Record Drawings <br />Record drawings are not part of the scope of work, since they will be provided by the Contractor. <br /> <br />5.13 Project Close-Out <br />Close out and archive Consultant’s project files and records. <br /> <br />5.14 Plan Revisions <br />Revise plans and specifications due to unforeseen conditions or changes in project scope, including: <br /> <br /> Replacement of the flagstone paving at the Tai Chi area with concrete paving <br /> Design of a custom concrete mounting for the 2016, 1992 and 1959 dedication plaques <br /> Review layout of additional boulders added to the project scope of work