Laserfiche WebLink
107.1 Submittal documents. <br />Construction documents, statement of special inspections and other data shall be submitted in <br />one or more sets with each permit application. The construction documents shall be prepared by <br />a registered design professional where required by the statutes of the jurisdiction in which the <br />project is to be constructed. Where special conditions exist, the Building Official is authorized to <br />require additional construction documents to be prepared by a registered design professional. <br />Exception: The Building Official is authorized to waive the submission of construction <br />documents and other data not required to be prepared by a registered design professional if it is <br />found that the nature of the work applied for is such that review of construction documents is not <br />necessary to obtain compliance with this Code. <br />107.1.1 Information on construction documents. <br />Construction documents shall be dimensioned and drawn upon suitable material. Electronic <br />media documents are permitted to be submitted when approved by the Building Official. <br />Construction documents shall be of sufficient clarity to indicate the location, nature and extent of <br />the work proposed and show in detail that it will conform to the provisions of this Code and <br />relevant laws, ordinances, rules and regulations, as determined by the Building Official. <br />107.1.1.1 Fire protection system shop drawings. <br />Shop drawings for the fire protection system(s) shall be submitted to indicate conformance with <br />this Code and the construction documents and shall be approved prior to the start of system <br />installation. Shop drawings shall contain all information as required by the referenced <br />installation standards in Chapter 9. <br />107.1.2 Means of egress. <br />The construction documents shall show in sufficient detail the location, construction, size and <br />character of all portions of the means of egress in compliance with the provisions of this Code. In <br />other than occupancies in Groups R-2, R-3, and I-1, the construction documents shall designate <br />the number of occupants to be accommodated on every floor, and in all rooms and spaces. <br />107.1.3 Exterior wall envelope. <br />Construction documents for all buildings shall describe the exterior wall envelope in sufficient <br />detail to determine compliance with this Code. The construction documents shall provide details <br />of the exterior wall envelope as required, including flashing, intersections with dissimilar <br />materials, corners, end details, control joints, intersections at roof, eaves or parapets, means of <br />drainage, water -resistive membrane and details around openings. <br />The construction documents shall include manufacturer's installation instructions that provide <br />supporting documentation that the proposed penetration and opening details described in the <br />construction documents maintain the weather resistance of the exterior wall envelope. The <br />ORDINANCE NO. 2016-014 12 <br />