Laserfiche WebLink
107.3.4 Design professional in responsible charge. <br />107.3.4.1 General. <br />When it is required that documents be prepared by a registered design professional, the Building <br />Official shall be authorized to require the owner to engage and designate on the building permit <br />application a registered design professional who shall act as the registered design professional in <br />responsible charge. If the circumstances require, the owner shall designate a substitute registered <br />design professional in responsible charge who shall perform the duties required of the original <br />registered design professional in responsible charge. The Building Official shall be notified in <br />writing by the owner if the registered design professional in responsible charge is changed or is <br />unable to continue to perform the duties. <br />The registered design professional in responsible charge shall be responsible for reviewing and <br />coordinating submittal documents prepared by others, including phased and deferred submittal <br />items, for compatibility with the design of the building. <br />Where structural observation is required by Section 1704, the statement of special inspections <br />shall name the individual or firms who are to perform structural observation and describe the <br />stages of construction at which structural observation is to occur (see also duties specified in <br />Section 1705). <br />107.3.4.2 Deferred submittals. <br />For the purposes of this section, deferred submittals are defined as those portions of the design <br />that are not submitted at the time of the application and that are to be submitted to the Building <br />Official within a specified period. <br />Deferral of any submittal items shall have the prior approval of the Building Official. The <br />registered design professional in responsible charge shall list the deferred submittals on the <br />construction documents for review by the Building Official. <br />Documents for deferred submittal items shall be submitted to the registered design professional <br />in responsible charge who shall review them and forward them to the Building Official with a <br />notation indicating that the deferred submittal documents have been reviewed and been found to <br />be in general conformance to the design of the building: The deferred submittal items shall not <br />be installed until the design and submittal documents have been approved by the Building <br />Official. <br />107.4 Amended construction documents. <br />Work shall be installed in accordance with the approved construction documents, and any <br />changes made during construction that are not in compliance with the approved construction <br />documents shall be resubmitted for approval as an amended set of construction documents. <br />107.5 Retention of construction documents. <br />ORDINANCE NO. 2016-014 14 <br />