My WebLink
|
Help
|
About
|
Sign Out
Home
Ord 2016-014
CityHall
>
City Clerk
>
City Council
>
Ordinances
>
2016
>
Ord 2016-014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2017 10:05:29 AM
Creation date
12/15/2016 2:22:58 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Ordinance
Document Date (6)
12/5/2016
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exception: Structural observations of the lateral system may be waived for one and two-story <br />wood residential structure when such structures are in full compliance with conventional light <br />frame construction of Chapter 23 of the California Building Code or the California Residential <br />Code. <br />SECTION 7-5-175: SOILS AND FOUNDATIONS <br />Sections 1803.8, 1803.9 and 1803.10 are added to the 2016 California Building Code to read: <br />1803.8 Review. Before issuing a permit for a building where soil and foundation investigation is <br />required, the Geotechnical Engineer or Civil Engineer in responsible charge of the soil <br />investigation shall state in writing (must be signed and stamped): <br />1. The plans and specifications substantially conform to the recommendations in the soil <br />investigation. <br />2. The Geotechnical Engineer or Civil Engineer in responsible charge of the soil <br />investigation has been retained to provide soil site observation and provide periodic and final <br />reports to the city. <br />1803.9 Field Report. Before requesting a foundation inspection from the City, the Geotechnical <br />Engineer or Civil Engineer in responsible charge of the soil investigation shall provide a written <br />field report stating: <br />1. The building pad was prepared and compacted in accordance with the soil report and <br />specification. <br />2. The foundation or pier excavation, depth, backfill materials, and drainage (if applicable), <br />substantially conforms with the soil report and approved plans. <br />1803.10 Final Report. Before final inspection for any building or structure, the Geotechnical <br />Engineer or Civil Engineer in responsible charge of the soil investigation shall issue a final <br />report stating the completed pad, foundation, finish grading, drainage, and associated site work <br />substantially conforms to the approved plans, specifications, and investigation. <br />SECTION 7-5-180: CONCRETE AND MASONRY FOUNDATION WALLS <br />Section 1807.1.6 of the 2016 Edition of the California Building Code is amended to read as <br />follows: <br />1807.1.6 Prescriptive design of concrete and masonry foundation walls. Concrete and <br />masonry foundation walls that are laterally supported at the top and bottom shall be permitted to <br />be designed and constructed in accordance with this section. Prescriptive design of foundation <br />walls shall not be used for structures assigned to Seismic Design Category D, E or F. <br />SECTION 7-5-185: MODIFICATIONS TO ACI 318 <br />Section 1905.1 is amended to read as shown below and Sections 1905.1.9 through 1905. 1.11 is <br />added to Chapter 19 of the 2016 Edition of the California Building Code: <br />ORDINANCE NO. 2016-014 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.