My WebLink
|
Help
|
About
|
Sign Out
Home
8E Consent 2017 0117
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 0117
>
8E Consent 2017 0117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2017 7:02:54 PM
Creation date
1/10/2017 7:02:50 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
1/17/2017
Retention
PERM
Document Relationships
Reso 2017-008
(Amended by)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of San Leandro <br />Sewer System Management Plan <br />Volume I <br />P a g e | 31 <br />Section 9 – Monitoring, Measurement, and Program <br />Modifications <br />D.13.(ix) Monitoring, Measurement, and Program Modifications: The Enrollee shall: <br />(a) Maintain relevant information that can be used to establish and prioritize appropriate SSMP <br />activities; <br />(b) Monitor the implementation and, where appropriate, measure the effectiveness of each element <br />of the SSMP; <br />(c) Assess the success of the preventative maintenance program; <br />(d) Update the program elements, as appropriate, based on monitoring or performance evaluations; <br />and <br />(e) Identify and illustrate SSO trends, including: frequency, location, and volume. <br />Introduction <br />The City of San Leandro meets the requirements of Section D, 13 (xi) Monitoring, Measurement, <br />and Program Modifications of the State Water Resources Control Board Order No. 2006-0003 <br />DWQ. In summary: <br />(1) The City monitors the implementation of the SSMP, and measures the effectiveness <br />of elements of the SSMP by developing and tracking Key Performance Indicators on <br />a monthly or annual basis. <br />(2) By tracking Key Performance Indicators, the City is able to assess the success of the <br />preventive or predictive maintenance program. <br />(3) The City has assigned the Collections Systems Maintenance Supervisor as the staff <br />person responsible for reviewing the SSMP annually in order to update program <br />elements as needed. <br />(4) The City tracks locations and volumes of all SSOs. <br />In order to monitor the implementation and measure the effectiveness of the SSMP, the City <br />tracks several Key Performance Indicators, including: <br />•Total number and volume of SSOs <br />•Location of all SSOs over the past five years (60 months) <br />•Location and volume of SSOs that reached surface water <br />•Number and characteristics of wet weather SSOs over the past 12 months <br />•SSOs by cause (e.g. roots, grease, debris, pipe failure, pump station failure, capacity, <br />other) <br />•Miles of gravity mainlines cleaned monthly and annually <br />•Miles of gravity mainlines CCTV inspected monthly and annually
The URL can be used to link to this page
Your browser does not support the video tag.