My WebLink
|
Help
|
About
|
Sign Out
Home
8E Consent 2017 0117
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 0117
>
8E Consent 2017 0117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2017 7:02:54 PM
Creation date
1/10/2017 7:02:50 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
1/17/2017
Retention
PERM
Document Relationships
Reso 2017-008
(Amended by)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of San Leandro <br />Sewer System Management Plan <br />Volume I <br />P a g e | 35 <br />Section 10 – SSMP Program Audits <br />D.13.(x) SSMP Program Audits: As part of the SSMP, the Enrollee shall conduct periodic internal audits, <br />appropriate to the size of the system and the number of SSOs. At a minimum, these audits must occur <br />every two years and a report must be prepared and kept on file. This audit shall focus on evaluating the <br />effectiveness of the SSMP and the Enrollee’s compliance with the SSMP requirements identified in this <br />subsection (D.13.), including identification of any deficiencies in the SSMP and steps to correct them. <br />SSMP Audits Discussion <br />The City will conduct an internal audit of the SSMP at least once every two years. The audit will <br />result in a report of the findings, including the identification of any deficiencies in the SSMP and <br />proposed steps to correct them. The two-year frequency is the maximum allowed by the <br />regulation; however this frequency is appropriate to the size of the City’s collection system and <br />the historical number of overflows, and should be sufficient to identify any necessary <br />improvements to the SSMP. The City will assess the need to audit its SSMP more frequently <br />based on the performance of its sanitary sewer system using information from the key <br />performance indicators and input from Collection System staff. All elements of the SSMP will <br />be reviewed using an audit checklist. The audit will include comments regarding recently <br />completed program updates and any recommendations for future actions, changes, or <br />adjustments to an element. Upon completion of the audit, the WPC Manager will keep a copy of <br />the audit report on file for review, and the Change Log will be updated to reflect insertion of the <br />audit report into the SSMP. <br />The City will update its SSMP at least every five years. The first update was completed <br />December 2016.
The URL can be used to link to this page
Your browser does not support the video tag.