Laserfiche WebLink
K. Please confirm if the concrete walkway along the building perimeter is at grade and <br />is ADA compliant and security station could be accessed through this route. If the <br />existing concrete walkway along the building perimeter is not at grade, accessible <br />parking spaces will need ADA ramps to the walkway. <br />L. On sheet CUP -1, show location for bike parking. <br />M. On sheet CUP -1, confirm if the solid grey hatch indicates landscape area. Provide a <br />pedestrian walkway through the landscape area from Verna Ct public sidewalk to <br />the security station so that pedestrians are not directed to the driveway and walk <br />through the parking lot to access the facility. <br />N. On sheet CUP -1, show dimensions for the parking stalls. Please refer to City of San <br />Leandro Standard Plans Dwg. No. 602, Case 3101 for accessible parking layout, <br />signage and pavement markings. <br />O. Please show North arrow on the plans. <br />P. On sheet CUP -1, provide a legend for different hatching patterns. <br />Q. During construction the following high standards for sanitation are required: Garbage <br />cans, construction dumpsters, and debris piles shall be removed on a minimum <br />weekly basis. All food related trash items such as wrappers, cans, bottles, and food <br />scraps shall be disposed of in closed containers only and shall be regularly removed <br />from the site. <br />R. Applicant shall reduce storm water pollution by implementing the following pollution <br />source control measures: <br />a) All storm drains shall be marked "NO DUMPING, DRAINS TO BAY' <br />b) All on-site storm drains shall be inspected and, if necessary, cleaned at <br />least twice a year including immediately prior to the rainy season. <br />c) Sidewalks and parking lots shall be swept regularly to minimize the <br />accumulation of litter and debris. Steam cleaning or low volume pressure <br />washing may be performed only after pre -cleaning using dry methods, <br />spot cleaning and recovery in stained areas and removal of all mobile <br />pollutants. Debris resulting from pressure washing shall be trapped and <br />collected to prevent entry into the storm drain system. Wash water <br />containing any soap, cleaning agent or degreaser shall not be discharged <br />to the storm drain. <br />d) Air conditioning condensate shall be directed to landscaped areas <br />e) Landscaping shall be designed to minimize irrigation and runoff, <br />promote surface infiltration where appropriate, and minimize the use of <br />fertilizers and pesticides that can contribute to storm water pollution. <br />f) Where feasible, landscaping shall be designed and operated to treat <br />storm water runoff by incorporating elements that collect, detain, and <br />Agreement to Conditions July 7, 2016 <br />PLN16-0025 Page 7 of 10 <br />