Laserfiche WebLink
Current List of Unfunded Projects with Costs and Weighted Scores <br />CMO Project Number Category Project Name <br />Detailed Est <br />(if done) <br />Likely Project Cost <br />(if no detailed est) <br />Fiscal Impact: <br />Net Cost <br />Economic <br />Development <br />Impact <br />Liability, Risk, <br />Public Health, <br />and Safety <br />Protection of <br />Existing <br />Facilities and <br />Lifespan Quality of Life <br />Population <br />Served <br />External or <br />Internal <br />Mandate <br />One time <br />Funding <br />Leverage <br />Weighted <br />Score <br />2018.1000 Roadways for vehicles Bridge and Embankment Maintenance $0 $400k to $800k 2 0 2 3 0 3 0 0 110 <br />2009.0030 Roadways for vehicles Lake Chabot Road Stabilization Design $290,000 2 0 3 2 0 1 0 0 100 <br />2006.0060 Roadways for vehicles Eden Road Construction $4,900,000 1 2 1 0 3 1 2 0 90 <br />2006.0061 Roadways for vehicles Eden Road - 2512 Davis Street Demolition $230,000 2 2 0 0 2 1 2 0 75 <br />2018.4000 Roadways for vehicles Marina Blvd Widen Teagarden to Alvarado $0 $3.2M to $6.4M 1 2 0 0 1 2 2 0 60 <br />2018.5630 Roadways for vehicles Citywide Signalized Intersection Imp $0 $200k to $400k 2 0 0 0 1 3 2 0 55 <br />2014.0450 Roadways for vehicles Fargo @ Washington Rt Turn Lane $880,000 2 1 1 0 0 1 0 0 50 <br />2018.5650 Roadways for vehicles Adaptive traffic signal control 2 int $0 $100k to $200k 1 0 0 0 1 2 2 0 40 <br />15