Laserfiche WebLink
Current List of Unfunded Projects with Costs and Weighted Scores <br />CMO Project Number Category Project Name <br />Detailed Est <br />(if done) <br />Likely Project Cost <br />(if no detailed est) <br />Fiscal Impact: <br />Net Cost <br />Economic <br />Development <br />Impact <br />Liability, Risk, <br />Public Health, <br />and Safety <br />Protection of <br />Existing <br />Facilities and <br />Lifespan Quality of Life <br />Population <br />Served <br />External or <br />Internal <br />Mandate <br />One time <br />Funding <br />Leverage <br />Weighted <br />Score <br />2016.0490 Bicycle and Pedestrian Manor Blvd Pedestrian Improvements $0 $1.6M to $3.2M 1 1 2 2 2 1 2 0 115 <br />2016.0550 Bicycle and Pedestrian Ped Signal at Davis and Carpentier $0 $200k to $400k 1 1 3 0 1 1 0 3 110 <br />2018.4470 Bicycle and Pedestrian Fairway Dr Streetscape & Reconfiguration $0 $1.6M to $3.2M 2 2 2 0 3 1 0 0 105 <br />x 2012.0120 Bicycle and Pedestrian E14th Pedestrian Imp 136th-S City Limit $390,000 1 3 1 0 2 3 2 0 100 <br />2006.0080 Bicycle and Pedestrian Doolittle Streetscape Davis-Fairwy Desig $480,000 0 1 1 0 2 2 3 3 100 <br />2018.5400 Bicycle and Pedestrian Downtown Pedestrian Lighting $0 $800k to $1.6M 1 2 2 0 2 2 2 0 100 <br />2018.5420 Bicycle and Pedestrian East 14th Pedestrian Lighting North $0 $100k to $200k 1 2 2 0 2 2 2 0 100 <br />2005.0100 Bicycle and Pedestrian E14th St Medians - 145th to S City Limit $3,570,000 0 2 2 0 2 3 2 0 95 <br />x 2018.4800 Bicycle and Pedestrian Williams St Pedestrian Imp near UPRR $0 $100k to $200k 2 1 2 0 2 2 1 0 95 <br />x 2018.4400 Bicycle and Pedestrian East 14th St Triangle Gateway $0 $800k to $1.6M 1 2 0 0 3 3 2 0 85 <br />2012.0132 Bicycle and Pedestrian Marina Blvd Streetscape Merced-Doolittle $0 $3.2M to $6.4M 0 3 1 0 2 2 2 0 85 <br />2012.0131 Bicycle and Pedestrian Marina Blvd Streetscape West of Doolittl $0 $3.2M to $6.4M 0 3 1 0 2 2 2 0 85 <br />2016.0441 Bicycle and Pedestrian West Industrial Area Ped Lighting Instal $0 $1.6M to $3.2M 1 2 2 0 2 1 0 0 85 <br />2016.0440 Bicycle and Pedestrian West Industrial Area Ped Lighting Study $70,000 1 2 2 0 2 1 0 0 85 <br />2018.4430 Bicycle and Pedestrian Davis St Landscape Rehab SLB to 880 $0 $100k to $200k 3 2 0 1 1 1 0 0 80 <br />2018.4490 Bicycle and Pedestrian Downtown Walkway Renovation $0 $200k to $400k 2 2 0 1 2 1 0 0 80 <br />2018.5440 Bicycle and Pedestrian Alvarado Street Pedestrian Lighting $0 $100k to $200k 1 1 2 0 2 2 0 0 80 <br />x 2018.5670 Bicycle and Pedestrian East 14th St Downtown Pedestrian Safety $0 $200k to $400k 2 1 2 0 0 2 1 0 75 <br />2018.4410 Bicycle and Pedestrian Marina Blvd Median Rehab East of 880 $0 $100k to $200k 3 1 0 1 1 1 0 0 70 <br />2018.4480 Bicycle and Pedestrian SLB Median Rehab Williams to E14th $0 $100k to $200k 3 1 0 1 1 1 0 0 70 <br />2018.4200 Bicycle and Pedestrian Davis St Bike Lanes Orchard to SLB $0 $400k to $800k 1 1 1 0 2 1 2 0 70 <br />2004.0170 Bicycle and Pedestrian MacArthur Blvd Streetscape Phase 2 $0 $800k to $1.6M 1 1 1 0 2 1 2 0 70 <br />2016.0340 Bicycle and Pedestrian Merced St Streetscape Williams to Wicks $0 $1.6M to $3.2M 1 2 1 0 2 1 0 0 70 <br />2018.4420 Bicycle and Pedestrian Durant Ave Streetscape E14 to Bancroft $0 $400k to $800k 1 0 2 0 2 1 1 0 70 <br />2018.4440 Bicycle and Pedestrian Durant Ave Streetscape McArth to Bncrft $0 $400k to $800k 1 0 2 0 2 1 1 0 70 <br />2016.0420 Bicycle and Pedestrian Bike and Ped Improve BART to Bayfair $0 $800k to $1.6M 1 2 0 0 2 1 0 1 65 <br />2018.5610 Bicycle and Pedestrian Pedestrian Crossing Improvements $0 1 0 2 0 1 1 1 0 60 <br />8