My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent 2017 0206
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 0206
>
8F Consent 2017 0206
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 10:53:52 AM
Creation date
1/31/2017 6:52:12 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
2/6/2017
Retention
PERM
Document Relationships
Agmt 2017 Smartwave Technologies, LLC
(Approved)
Path:
\City Clerk\City Council\Agreements\2017
Reso 2017-017
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Consulting Services Agreement between January 17, 2017City of San Leandro and SmartWAVE Technologies Page 15 of 16 <br />EXHIBIT A <br />SCOPE OF SERVICES <br />SmartWAVE will provide the following products and services for the WiFi deployments at the San Leadro Police Department, Civic Center, and Water Pollution Control Plant: <br />• Kickoff Meeting to review project requirements, statement of work and project schedule with City IT Staff <br />•Develop propagation map identifying proposed node placements and expected coverage and capacity <br />• Perform a Wireless Site Survey for the wireless network <br />• Modify design and review with the project stakeholders identifying issues, gaps in coverage and expectations <br />• Provide all wireless network equipment <br />• Perform pre-install burn-in/configuration of WiFi Access Points (AP) and associate to Cloud Controller Platform <br />• Perform re-pulls of 5 Cat5E cables at the Civic Center. All other network cabling is in place or provided by others. <br />• Install APs at locations identified on the AP placement map and confirm power on and Cloud Controller visibility <br />• Perform post install coverage tests <br />• Document the final implementation <br />o Logical and physical diagrams <br />o Design document <br />• Transition network to operation support <br />• Submit invoices to Accounts Payables <br />92
The URL can be used to link to this page
Your browser does not support the video tag.