Laserfiche WebLink
5 <br />Current FeeDescription Reference <br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued) <br />2 Building Permit (Continued) <br />G. Plan Checking <br /> <br /> <br />(1) Residential Fire Sprinklers for 1 & 2 Family Dwelling New <br />Construction. Effective January 1, 2011, fire sprinkler systems became <br />mandatory in 1 and 2 family dwellings. The Division of Building and <br />Safety will be reviewing and inspecting the installation of these systems. <br /> <br />(2) In-house- During Regular Working Hours 80% of the building permit fee <br />For Master Plans (i.e. identical buildings built by the same builder <br />on the same lot or in the same tract and for which building permits <br />are issues at the same time): <br />Changes, revisions, or additions to plans previously checked.Direct Cost (1) - 1 hour minimum charge <br />Outside plan checking services as utilized at discretion of Building <br />Official. <br />Same as for In-house- During Regular Working Hours <br />Additional Plan Review after the first recheck Direct Cost (1) - 1 hour minimum per occurrence <br />(3) In-house - outside of normal business hours when requested by <br />Applicant <br />(4) By Outside consultant, when requested by Applicant <br />(5) Over the counter for small changes, revisions or additions, when <br />requested by applicant <br />Direct Cost (1), with minimum of one-half hour <br />(6) Expedited Plan Check when requested by applicant & when plan <br />reviewer is available <br />Full plan check fee plus one and one-half times Direct Cost (1) <br />(7) Phased Plan check- when the foundation or another part of the <br />building needs approval and permit issuance prior to the whole building <br />One and One-half (1-1/2) times the full plan check fee for the <br />entire building <br />(8) Alternate Methods and Materials Direct cost (1) 1 hour minimum charge <br />(9) Energy Conservation: for all buildings subject to the California <br />Energy Commission’s conservation regulations <br />20% of Building Permits <br />(10) California Health & Safety Code (CHSC), section 18949.29 fee <br />applied to all projects requiring a "Building Permit". <br />3 Electrical Permit <br />A. Filing and Issuance $100 plus the amount shown below for each electrical item <br /> B. Plan-Check, when applicable Direct Cost (1) <br />For Construction and additions with valuations over $100,000 including all <br />circuits, service and sub panels. <br />13% of building permit fees <br />All Electrical circuits $12.70 <br />Trolley and plug-in type bus-ways, per linear foot $0.70 <br />Lighting fixtures, brackets, pendants, cord drops, outlets, receptacles, <br />switches and other lamp holding devices, each on existing circuits <br />$1.50 <br />Multi-outlet assemblies, light tracts, per linear foot $1.30 <br />Temporary power service pole or pedestal, each $31.40 <br />Temporary distribution system (for construction sites, Xmas tree lots, <br />etc.), each <br />$31.40 <br />Service or Service Change: <br />Services over 600 volts: <br /> Up to 200 amp, each $111.20 <br /> Over 200 amp, each $111.20 <br />Services 600 volts or less, each <br /> Up to 200 amp capacity $38.30 <br /> Over 200 amp capacity $76.60 <br />(1)Direct Cost = hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs <br />Circuits: Installation, replacement or alteration of each electrical circuit (includes related outlets, switches, receptacle and lighting fixtures): <br /> <br />Plan checking fee shall be paid at the time of application for a building permit. The plan checking fee is in addition to the building permit fee <br />and shall be as follows: <br />$527.00 flat fee to include plan review and inspection of <br />residential fire sprinkler systems when installed in conjunction with <br />new 1 & 2 family dwelling construction. <br />Same as for In-house- During Regular Working Hours PLUS <br />overtime and overhead charges <br />Equal to In-house - During Regular Working Hours PLUS <br />Consultant's fee as established by Agreement (contract) between <br />City and Consultant <br />A full plan checking fee shall be paid for each Master Plan when <br />more than one building will be built and one half (50%) of the full <br />plan checking fee shall be paid for each building at time of <br />li ti <br />5% of Building Permit Fee - For training and continuing <br />education required by the CHSC § 18949. <br />Appendix A: 543