My WebLink
|
Help
|
About
|
Sign Out
Home
2A Work Session 2017 0313
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 0313
>
2A Work Session 2017 0313
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2017 3:16:54 PM
Creation date
3/8/2017 3:16:05 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
3/13/2017
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 17-075 <br />agreement with Stantec Consulting Services, Inc. for the preparation of the San <br />Leandro Creek Trail Master Plan <br />Applicable General Plan Policies <br />·This action is consistent with San Leandro Creek Goal No. OSC-5 of the General Plan and <br />Policy OSC-5.1 Creek Stewardship <br />Environmental Review <br />Draft San Leandro Creek Trail Master Plan Study is a feasibility study; per Caltrans, no <br />environmental review is required. <br />Summary of Public Outreach Efforts <br />Chapter 2 Public Outreach of the Draft San Leandro Creek Trail Master Plan lists and <br />summarizes the public outreach efforts which included Citizen Advisory Committee meetings, <br />Technical Advisory Committee meetings, workshops, community survey, and additional <br />meetings. <br />Attachment to Staff Report <br />·Draft San Leandro Creek Trail Master Plan <br />PREPARED BY: Anjana Mepani, Senior Planner, Community Development Department <br />Page 4 City of San Leandro Printed on 3/8/2017 <br />8
The URL can be used to link to this page
Your browser does not support the video tag.