My WebLink
|
Help
|
About
|
Sign Out
Home
2A Work Session 2017 0313
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 0313
>
2A Work Session 2017 0313
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2017 3:16:54 PM
Creation date
3/8/2017 3:16:05 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
3/13/2017
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Segment Analysis 4 <br />4-3 <br />4.0 SEGMENT ANALYSIS <br />This report is organized into eight segments that highlight opportunities and <br />challenges for construction of the potential trail. The potential trail runs <br />through differing jurisdictions and terrains. Therefore, while the corridor must <br />be looked at in its entirety, it is also helpful to look at specific areas differently. <br />Consequently, the document will be organized into the following segments <br />from west to east: <br />• Segment 1: San Leandro Bay to Hegenberger Road <br />• Segment 2: Hegenberger Road to 98th Avenue <br />• Segment 3: 98th Avenue to I-880 <br />• Segment 4: I-880 to Railroad <br />• Segment 5: Railroad to East 14th Street <br />• Segment 6: E. 14th Street to Bancroft Avenue <br />• Segment 7: Bancroft Avenue to I-580 <br />• Segment 8: I-580 to Chabot Park <br />FIGURE 4-1: PROJECT AREA SEGMENTS <br />49
The URL can be used to link to this page
Your browser does not support the video tag.