Laserfiche WebLink
Segment Analysis 4 <br />4-19 <br />to Capistrano Drive. A trail on the north side <br />of Sobrante Park connects Madison Park <br />Academy to Bergedo Drive. <br />The possibility of developing a trail other than <br />on the maintenance road in this segment is <br />meager due to private property abutting the <br />San Leandro Creek. There is publicly owned <br />land that may be able to accommodate <br />a multi-use trail in Madison Park Academy <br />and Sobrante Park. However, this will require <br />permission and agreement with the Oakland <br />Unified School District and the City of Oakland, <br />respectively. <br />There are drainage pipes crossing the San <br />Leandro Creek, supported by a steel structure, <br />at the east end of Segment 4 on the west of <br />the railroad tracks (Refer to Figure 4-16). Any <br />alignment through this section will need to <br />consider the pipes. Due to the disconnected <br />nature of trail development feasibility along <br />the San Leandro Creek in this segment, <br />neighboring streets need to be explored for <br />possible trail alignment. <br />FIGURE 4-19: SEGMENT 4 EXISTING CONDITIONS FIGURE 4-16: PIPES SUPPORTED BY STRUCTURE <br />65