My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2017-027
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2017
>
Reso 2017-027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2017 2:00:04 PM
Creation date
3/9/2017 10:40:09 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
3/6/2017
Retention
PERM
Document Relationships
_CC Agenda 2017 0306 CS + RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 0306
8J Consent 2017 0306
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 0306
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Provide Sediment sampling and testing <br />• Provide Geotechnical Engineering Services <br />• Perform Engineering Design Calculations or related services <br />5. Deliverables <br />GHD will prepare a Marine Facilities Decommissioning Assessment which will include: <br />• Items to be decommissioned <br />• Permitting and regulatory compliance <br />• Engineering assessment of demolition activities <br />• Decommissioning and Demolition cost estimate <br />• Decommissioning schedule estimate <br />5.1 Assumptions <br />GHD has made the following assumptions in developing our costs for the scope of work outlined in <br />Section 4. <br />• GHD will have unrestricted access to the Site for investigation and sampling <br />• Validation will not be conducted on laboratory analytical results of samples collected under this scope <br />of work <br />• GHD will be allowed no less than eight hours of access to the Site per day <br />• Sampling will be conducted in one comprehensive sampling event (e.g., one mobilization). This <br />Proposal includes costs for only those quantities of samples and sample analysis specified in Table 1 <br />Based on Site observations, additional samples may be recommended <br />• Decommissioning and demolition contract documents and technical specifications are not included in <br />this scope of work, but pricing for preparation of these documents can be provided upon request <br />• Decommissioning and demolition oversight is not included in this scope of work, but pricing to provide <br />oversight of these activities can be provided upon request <br />6. Costs <br />GHD will complete the defined scope of work outlined in this proposal on a time and materials basis in <br />accordance with the costs presented in Table 1. <br />GHD does not charge a premium for overtime, weekend, or holiday work necessary to meet client <br />deadlines. <br />Consulting Services Agreement between City of San Leandro and GHD Services, Inc. March 6, 2017 <br />Exhibit A — Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.