Laserfiche WebLink
Review and approve shop drawings, samples and other data which the Contractor is required to submit, but <br /> only for conformance with the design concept of the project and compliance with the information given in <br /> the Construction Contract Documents. Such reviews and approvals or other action will not extend to <br /> means, methods, techniques, sequences or procedures of construction or to safety precautions and <br /> programs incident thereto. Budget for this task is based on up to two reviews for each submittal. Additional <br /> reviews would be provided as additional services and should be charged to the contractor by the City. City <br /> shall be responsible for final approvals and issuing all submittal reviews to the contractor. <br /> 5.03 Requests for Information (RFI's) <br /> The Consultant shall prepare necessary interpretations and clarifications of the Construction Contract <br /> Documents in response to RFIs forwarded by the City. Responses shall be sent to the City and not to the <br /> Contractor <br /> 5.04 Requests for Quotations (RFQ's) <br /> Prepare sketches and narratives for change order quotations of additional work as requested by the City. <br /> Work also includes review of the contractors price proposals. <br /> 5.05 Change Orders <br /> Not included, Construction bulletins, work directive changes and change orders shall be prepared by the <br /> City. <br /> 5.06 Substitutions <br /> Evaluate and determine the acceptability of substitute materials and equipment proposed by the Contractor <br /> to the extent provided in the General Conditions of the construction contract. <br /> 5.07 Site Visits <br /> Make eight visits to the site at intervals appropriate to the various stages of construction in order to observe <br /> the progress and quality of the various aspects of the Contractor's work. Based on information obtained <br /> during such visits and on such observations, Consultant will endeavor to determine, in general, if such work <br /> is proceeding in accordance with the contract documents. <br /> Deliverable shall be a site observation report for each site visit. <br /> 5.07A Well Construction Support Services <br /> The Consultant shall provide support services for the construction of the well. Work shall include: <br /> Pilot hole drilling observation—Observe the drilling of the pilot hole during critical times and document the <br /> subsurface conditions. Geologically log samples of the cuttings take at 5-foot intervals by the driller. <br /> Perform sieve analyses on selected samples to aid in the lithologic evaluation and to assist in confirming <br /> screen slot-size in the production well. Following the completion of the pilot hole drilling, geophysical <br /> logging will be performed in the pilot hole by a selected service company. The resulting logs will be <br /> interpreted for a prognosis of water quantity and quality for the production well. <br /> Production well design—Prepare final well construction diagram for the production well. Details shall <br /> include completion depth, screen intervals, screen slot size, gravel pack gradation, and depth of seal for the <br /> production casing. <br />